 Alden Corrugated Loading Dock |
 Alden Corrugated Loading Dock |
 Briar Patch |
 Brockway-Main Line |
 Brockway GradeX-ing |
 Brockway Grade X-ing2 |
 Brockway Grade X-ing Aerial |
 Brockway Mine Overall |
 Brockway Mine with bays |
 Brockway Mine with bays-2 |
 Cars Under Bldg Overhang |
 Conveyor |
 Conveyor-2 |
 HopperBay-1 |
 LessRocky-1 |
 Main Line Greenery |
 Mine Stairway |
 Overhead Bridge X-over WIP |
 Pipe Bridge |
 Pipe Bridge Closeup |
 Single Track Ballasted Deck Bridge Finished |
 Single Track Ballasted Deck Bridge Side |
 Brockway Mine Scale House |
 Truck Hopper Bay |
 Vosburg Backdrop Greened |
 Vosburg Backdrop Greened-2 |
 Vosburg Dense Forest |
 Vosburg Greened |
 The Spaghetti Bowl that is Mike's Trackplan |
 Trackplan2-06DPS.jpg |
 After Trees |
 After Trees (heading south) |
 After Trees (looking south) |
 Mehoopany Backdrop |
 Brockway Mine With Finished Foliage |
 Fun with the 300mm Telephoto |
 Close-up Tele shot of Brockway Mine |
 Tele Picture of Brockway Mine |
 Brockway Mine tight shot |
 Coal Hoppers (somewhere in PA) |
 Overall peninsula view |
 Mehoopany viaduct left hand side |
 Mixed Freight Heading South |
 Mehoopany Backdrop (overall view) |
 Mehoopany Backdrop-Elevated |
 Mehoopany Backdrop |
 Mehoopany Future Underpass |
 Mehoopany Future Viaduct |
 Mehoopany's right side mountain (Binghampton Side) |
 Mehoopany RH mountain |
 Mehoopany Portal |
 GradeX-ingPlantedNoPaint-1.jpg |
 GradeX-ingPlantedPainted.jpg |
 MineOfficePlantedNoPaint-1.jpg |
 MineOfficePlantedNoPaint-2.jpg |
 MineOfficePlantedNoPaint-3.jpg |
 MineOfficePlantedPainted-1.jpg |
 MineOfficePlantedPainted-2.jpg |
 IMG_3814.JPG |
 IMG_3815.JPG |
 IMG_3818.JPG |
 IMG_3819.JPG |
 IMG_3820.JPG |
 IMG_3822.JPG |
 BackOfRearWall.jpg |
 BackOfRearWallFullLength.jpg |
 BothBridgesTestFit.jpg |
 FormBeingGlued2Wall.jpg |
 FormGlued2Wall.jpg |
 FormReinforcementAllGlued.jpg |
 FormReinforcementsBeingGlued.jpg |
 FrontSideFinishedFormedWall.jpg |
 GluingARearWallToMDF.jpg |
 GluingFormedWall2ArchUnderpass.jpg |
 InsideEmbankmentScreenWork.jpg |
 RearConcreteBridgePre-Install.jpg |
 RearConcreteBridgePre-InstallFront.jpg |
 RearRetWallCloseUP.jpg |
 RearRetWallDone.jpg |
 RearRetainingBeingGlued.jpg |
 ScreenWireOnEmbankment(2).jpg |
 ScreenWireOnEmbankment(3).jpg |
 ScreenWireOnEmbankment.jpg |
 SignalBunkerArea2BCovered.jpg |
 SignalBunkerStyreneBase.jpg |
 SignalBunkerStyreneCovered(2).jpg |
 SignalBunkerStyreneCovered(3).jpg |
 SignalBunkerStyreneCovered.jpg |
 UnforgivingLowAngleThroughTunnelView.jpg |
 WallGluingClamped.jpg |
 IMG_3884.JPG |
 IMG_3885.JPG |
 IMG_3886.JPG |
 IMG_3887.JPG |
 IMG_3888.JPG |
 IMG_3889.JPG |
 IMG_3890.JPG |
 IMG_3891.JPG |
 IMG_3892.JPG |
 IMG_3893.JPG |
 IMG_3894.JPG |
 IMG_3895.JPG |
 IMG_3896.JPG |
 IMG_3897.JPG |
 IMG_3898.JPG |
 Mehoopany Viaduct Basically Complete |
 IMG_3900.JPG |
 IMG_3901.JPG |
 Northbound CR local at Mehoopany |
 IMG_3911.JPG |
 Approaching Binghamton |
 First switch at Mehoopany Paper |
 IMG_3914.JPG |
 IMG_3915.JPG |
 IMG_3916.JPG |
 IMG_3917.JPG |
 IMG_3918.JPG |
 IMG_3919.JPG |
 IMG_3920.JPG |
 IMG_3921.JPG |
 IMG_3922.JPG |
 IMG_3923.JPG |
 IMG_3924.JPG |
 IMG_3925.JPG |
 IMG_3926.JPG |
 IMG_3927.JPG |
 IMG_3928.JPG |
 IMG_3929.JPG |
 IMG_3930.JPG |
 ErinPre-CleanupLeft.jpg |
 ErinPre-CleanupRight.jpg |
 ErinPre-CleanupOverall.jpg |
 ErinPre-CleanupOverallEnd.jpg |
 ErinPost-CleanupLeft.jpg |
 ErinPost-CleanupRight.jpg |
 ErinPost-CleanupOverallEnd.jpg |
 ErinPropsedViductBridge.jpg |
 NLadRemovableHatch.jpg |
 PittstonEngineTermDrawerOpen.jpg |
 PittstonEngineTermExtension.jpg |
 POETrackLeft.jpg |
 POETrackLeftAerial.jpg |
 POETrackRight.jpg |
 POETrackRightAerial.jpg |
 PortOfErinTrackLayoutRev2.jpg |
 PortOfErinTrackLayoutRev3.jpg |
 NewPOESwitchingLead-2.JPG |
 NewPOEswitchingLead-1.JPG |
 NewPOEswitchingLead-3.JPG |
 NewRemovableGrainElevatorBase.JPG |
 RemovableBaseBracket.JPG |
 AerialviewErinEngTerm&Mid-CityNewLeads.jpg |
 ElevatorRearView.jpg |
 POEelevatorMock-up.jpg |
 POErightHandCut.jpg |
 CulvertSceneryBeginning.jpg |
 PinkFoamRemovableModule.jpg |
 RemovableModuleInPlaceNoScreen.jpg |
 RemovableModuleSupports.jpg |
 StreamBedCloser-up.jpg |
 Port of Erin Removable Scenic Section |
 Removable Section--Rear |
 Spot for removable module |
 Retaining wall embankment |
 Use of the handle! |
 Removable module in place. left view |
 Module in place, right view |
 Plastered stream area |
 Plastered embankment |
 Alternate stream bed view |
 Scenery continues to the front |
 Plastered removable module |
 Module rear |
 Module in-place |
 Alternate module view |
 Culvert under tracks, "aerial" inside view |
 Embankment under engine terminal |
 Another view..... |
 Finally moving to the left side of the viaduct |
 Industry foam bed in place |
 Getting ready for screen |
 Area with screen |
 More of Saturday night's work |
 Vertical view |
 Aerial down |
 Wider angle view |
 Plastered left hand side |
 Vertical view |
 Overall view of area just under engine terminal |
 If plaster is good.....paint is better! |
 IMG_4286.JPG |
 IMG_4287.JPG |
 IMG_4288.JPG |
 IMG_4289.JPG |
 DIRT! |
 Right hand dirt |
 "Aerial" dirt view |
 Making the Water Template |
 GREEN! |
 Green on the right too |
 Waterfront plywood |
 Back track ballasted |
 Overall view of Port of Erin right hand side |
 Stream bed given "depth" |
 Another stream bed view. |
 Aerial shot showing the rear ballasted deck bridge |
 Looking towards staging, POE left |
 Removable hatch with grass |
 Debris field |
 Blue sky through culvert |
 Photo in place behind the back deck girder bridge |
 Aerial overview of ballasted scene |
 Tweaked ballast |
 Brushed removable hatch and hidden handle |
 More views of hiding the seam |
 One more view of hiding the seam |
 Lower view |
 Final stages of front scenery work: "tunnel portal" under Engine Terminal |
 Alternate view |
 Yet Another View! |
 Original view shot |
 Screen-only did not last long! |
 Sculptamold! |
 Added rocks |
 Portal view |
 Another view of today's Sculptamold work |
 Dock/Sea Wall and screen embankment in place |
 Alternate view, same area |
 Raised view, same area |
 Plastered embankment, left side |
 Raised view of plastered embankment |
 Ready for Sculptamold |
 Sculptamold rocks in place |
 Rock formation close-up |
 Into the tunnel view |
 Different angle |
 Other end of waterfront |
 Colored a formation |
 Sculptamold colored |
 Left hand formation plastered & dirt-ed |
 A slightly different view |
 Fascia #1 |
 Another view |
 Upright view of pour |
 Wide angle view of plaster pour |
 Coloring in the scene |
 Another view |
 Alternate angle showing rocks near future bridge abutment |
 Culvert view |
 Depth added to river bottom with black spray paint |
 Black added up to and inside culvert |
 Looks better with tape off! |
 Overall scene view, ready for water soon. |
 Fascia clamping |
 After clamps |
 Foliage bump-out |
 Overall view, ready for water |
 Debris field cleaned so viaduct work can commence |
 Test fit of abutment walls |
 Alternate view |
 Lots of clamps again! |
 Underneath clamping |
 Glue-ed up and ready for installation |
 Alternate view |
 Temporarily placed |
 Bridge girders placed temporarily |
 Other side view |
 Bridge components ready for placement |
 Trimmed abutment walls |
 Bridge test fit, final |
 Another bridge component view |
 Bridge floor, upside-down look |
 Bridge in place with retaining, left side view |
 Right side view |
 Overhead view |
 Underneath view |
 Little pink triangles.....for you and me! |
 Wood braces |
 Screen applied to left side embankment |
 Right side screen |
 Plastered! |
 Right side plastered |
 Finished the remainder of the old embankment too |
 Painted and dirt applied |
 Right side with dirt |
 Conrail gray ballast in place |
 Ready for Sculptamold |
 Sculptamold applied, partially carved |
 More vertical lines in place |
 Finished abutment face! |
 Left side view |
 Right side view |
 Rocks and footing stained |
 More ballasting in the distance |
 Cleaned up view |
 Stained abutment rocks |
 Right side cleaned-up view |
 With bridge in place |
 Left side view with bridge |
 With a train |
 Filled in the gap with screen |
 Transition from Port scenery into staging |
 Close-up |
 Area behind engine terminal |
 Plastered screen into staging |
 Homa-bed clamped in place after gluing |
 Plastered embankment and unpainted Homa-Bed |
 Painted over the embankment and Homa-Bed. |
 Dirt! |
 Green! |
 Ballasted main line at Vosburg |
 Ballasted transition from staging to Port of Erin |
 CR local passing behind Hammill engine terminal |
 Tail end of a test train |
 In your face view of "newly painted" ATSF SD-45-2 |
 Southbound grain test train behind Hammill engine terminal |
 Neil Schofield's engines on High-Wide extra at Mehoopany |
 Overall view of High-Wide extra |
 Port of Erin trackage mostly cut and in place! |
 Other side of abutment |
 Alternate view of Mid-City Scrap, etc. |
 Close up of turnouts at Port of Erin tail track |
 CrossingInstalled.jpg |
 Dock/Sea Wall with Apron In Place |
 Overall View pre-water |
 Macro Close-up |
 Down-on view |
 Resin water poured |
 Fooling around with the macro lens-1 |
 Fooling around with the macro lens-2 |
 Second Pour |
 Second Pour |
 Alternate view |
 Lower angle view |
 This one has a different colored plastic tie in place |
 IMG_4440.JPG |
 Wet track! |
 More examples |
 Under the bridge |
 Getting drier |
 Not every blank spot got a tie |
 Liking this one even better! |
 Main Erin lead |
 1793@Mehoopany-1.jpg |
 1793@Mehoopany-2.jpg |
 1793@Mehoopany-3.jpg |
 Old cars on new "old" track |
 Aerial view of old cars, newly weathered track |
 "Ground" shot, same spot. |
 Track to the right of the viaduct at Erin, weathered |
 More weathered track with an old car |
 Near Mid-City Scrap switch |
 Kinky enough for you? |
 Left side of viaduct |
 More left side trackage |
 Still more |
 Last shot weathered track |
 Left side of left side! |
 Right side of left side (!) |
 Higher view of "boomerang insert" |
 New seawall on left side, right half |
 New seawall on left side, left half |
 New embankment on the right |
 New embankment on the left! |
 Left side plastered. |
 Right side plastered. |
 Initial fascia in place |
 Vertical shot, looking in from staging. |
 Crossing and grain elevator track in place |
 Forms for paving |
 Weird angle showing road system |
 Pre-pour view |
 After the pour |
 More post-pour |
 AFTER the clean-up |
 Weird angle showing road system, better paving |
 Close up of crossing in pavement. |
 Initial implementation of Colfax, Inc. |
 Future grain facility |
 "Concrete base" of styrene and wooden nickels |
 Electrical conduit silos |
 Alternate view of unpainted but scribed silos |
 Silos pre-painting |
 Silos more properly rotated |
 Painted silos |
 Alternate view of painted silos |
 Early Colfax structure construction |
 Another view |
 Trackside view |
 Dulled and faded silos |
 Partially assembled truck loading facility |
 Rear view |
 Rear-end view |
 Platform without roof |
 Front angle view, roof still off |
 A more typical view |
 Another front view |
 From the left front |
 "Concrete" chairs for piping |
 Pump house and sample etched metal gate |
 More views of painted fencing. |
 Finished loading piping |
 Down-on view |
 Tank UN-loading piping in place |
 Tank car unloading piping |
 Piping and brackets cut and filed flush underneath, and painted. |
 Cross-silo walkway under construction |
 Ladder cage view |
 Down-on shot of unpainted walkway |
 Walkway painted silver |
 More Real-Estate Was Needed! |
 Raw Materials For Wall |
 Foam additions |
 Hot-Glued Foam Extensions In Place |
 Retaining Walls Test Fit |
 Hot Glued In Place |
 Sculptamold In Place |
 Another view |
 View From "The Embankment" of the Viaduct |
 Static-grass maestro Jim Dufour does his thing at Hammil Yard |
 Jim using the Noch Static Grass applicator |
 Mike Confalone and Mike R cooperate on static grass |
 Using cardboard to keep hairspray off the rails |
 MEC U18B 404 trudging through the new grass below Brockway |
 Rear view of local and new grass |
 "Aerial" view of local showing switchback move and static grass |
 Local heading onto branch at Mehoopany |
 Added cars to local, mainly displaying the grass! |
 Grassy slope below hoppers at Brockway Mine |
 MEC 404 exiting Vosburg Tunnel, note new grass on left |
 Overall view of industrial track behind Hammill |
 CR U-23C in newly grassy Hammil Yard, north end |
 Side view of CR U-23C and new grass |
 U-23C 6915 on a nice sunny day at Hammill Yard. |
 CR power at Hammill North Ladder |
 Different view of CR power at Hammill Yard North Ladder |
 CR 3195, Atlas GP-40, Hammill North Ladder |
 Different view of CR 3195 |
 CR B-23-7 2812 at Hammill North Ladder |
 Depressed center flatcar in the weeds behind Hammill Yard |
 Looking south from North Ladder at Hammill |
 Overall view of grass efforts at Hammill Yard |
 Fence corner.jpg |
 Fence macro-closeup.jpg |
 Fence-closeup.jpg |
 Fences-multiple.jpg |
 Fences-road gate.jpg |
 Fences-track gates.jpg |
 Macro close-up of hand-made slope fence |
 Inside view of slope fence (Macro) |
 NWSL chopper used to cut half round styrene |
 Right side slope fence under construction |
 Track gates |
 Right side slope fence assembled |
 Rear fence in place |
 Overall view of fenced-in Colfax |
 Ballasted siding |
 Close-up showing tank car loading pipe and "hoses" |
 Ground level view |
 Open track gates |
 E&SH SD-9 makes an appearance to switch Colfax |
 E&SH SD-9 pulling tank cars |
 Alternate view |
 Overhead view |
 See if you notice the difference from the previous picture! |
 Work done, plant track gate closed |
 More greenery in background, static grass in places |
 Front view for Mike C.! |
 Closer-up view of newly added greenery and static grass |
 Attempted "artsy" view from underneath bridge |
 Taken a week later |
 Overhead view of finished (for now) scene |
 Front overhead view |
 "Confalone" view! |
 Left side embankment with greenery added |
 E&SH shuttling grain cars behind Colfax |
 Overall view of E&SH transfer run |
 View looking right |
 Mock-up of proposed grain facility |
 Alternate view of mock-up |
 Elevated view of mock-up |
 New Real Estate is always good! |
 Close-up of newly added piece |
 Clamped while adding a shim for proper leveling. |
 Weird left hand bracing close-up. |
 Structural fascia pieces added |
 Various grain terminal elevator mock-ups. |
 Various grain terminal elevator mock-ups. |
 Various grain terminal elevator mock-ups. |
 Various grain terminal elevator mock-ups. |
 Pipe in jig, cut |
 Pipe in jig, in saw |
 Close-up of hold-down clamp in use |
 Pipe with jig components |
 Underside of jig |
 How the pipes will "nest" |
 Box of pipes! |
 Construction Jig |
 Milled Pipe Assembly |
 Adding Rear Silos |
 Adding Rear Silos |
 Adding Rear Silos--Final |
 Rear of Facility |
 Spot Where Assembly Will Go |
 Assembled silos on 4x8 sheet for top & bottom tracing |
 Modified pencil! |
 Creating the proper lip offset |
 Ready to start cutting |
 Scribe & snap in a larger scale of material |
 Base & scalloped top, rough nibbled |
 Initial Elevator Construction |
 Gluing the bottom bracing |
 Adding the mid-bracing |
 The front goes on |
 Assembled Elevator with pilasters |
 Alternate view |
 Low angle view for perspective |
 In place at Port of Erin |
 In place at Port of Erin |
 In place at Port of Erin |
 In place at Port of Erin |
 Center Punching the Holes Pre-Drilling |
 Using the Drill Press to Make the Port Openings |
 Close-up of Forstner Making the Flat Bottomed Holes |
 In-Place Shot Showing Drilled Port Holes |
 Close-up of Inspection Port |
 Inspection Ports Drilled on Long Silo Row |
 The Varibit Makes Short Work of the Openings |
 Quick & Easy to Square Up With the File |
 Placement of Dust Collector |
 "Pot Toppers" used in marsh area |
 New programming track location |
 Roadbed gluing for new curved switch at Binghamton |
 Curved Peco turnout for new Binghamton Engine Terminal Track |
 Engine Terminal track extensions and new track |
 New programming track in place |
 New Peco turnout |
 Adding more greenery along Mehoopany Creek |
 Sidings spiked, dirt balasted at Port of Erin (Mid-City Scrap & PA-Crcyc) |
 Taped off for paving |
 Paving in place |
 Additional dirt and concrete apron |
 Finished basic vegetation at Mehoopany Creek |
 Mid-City office, PA-Crcyc building positioned |
 "Taken from boat" ground level shot of Mid-City Scrap |
 Alternate "Taken from boat" ground level shot of Mid-City Scrap |
 Aerial shot of Mid-City Scrap |
 Alternate "aerial" shot of Mid-City Scrap |
 Another aerial of Mid-City Scrap |
 "Standing on viaduct" shot |
 Telephoto from underneath viaduct |
 Mid-City Scrap gets a new sign! |
 New type of rust treatment |
 Scrap picker |
 Over-view, KRL flat in background |
 Overview, gon in background |
 Close-up of new scrap pile & rust treatment |
 New E&SH power! |
 Grainzilla Takes Shape! |
 IMG_8067.JPG |
 IMG_8068.JPG |
 IMG_8069.JPG |
 IMG_8070.JPG |
 Car Unloading Shed |
 IMG_8072.JPG |
 IMG_8073.JPG |
 IMG_8074.JPG |
 IMG_8075.JPG |
 Triple Length Ladder Cage Soldered Together |
 Roof in Place on Largest Elevator Cupola |
 Inside View of Roof Construction |
 IMG_8080.JPG |
 IMG_8081.JPG |
 IMG_8082.JPG |
 Tall Leg Piping |
 Tall Leg In Place |
 Tall Leg In Place |
 IMG_8086.JPG |
 Shorter Leg Mounting Pins |
 Cross Conveyor Mountings |
 Short Leg Piping |
 Cross Conveyor In Place |
 Short Leg In Place |
 View of both Legs and Elevator Lettering |
 IMG_8093.JPG |
 First view of my new brass railings! |
 End view of new brass railings |
 Another view of new brass railings |
 "Gerbil" and feeder pipes |
 Repaired Dust Bin |
 Overall view of elevator top |
 Elevator Top |
 Left Side Elevator Top |
 Painted Gerbil, Dust Bin & Pipes |
 IMG_8112.JPG |
 Added "peeling paint" under silo 2 cap |
 Overall view showing painted silo bases |
 Large silo group with installed railings |
 All windows installed, insides of walls painted black to show nothing |
 Treatment of railing seam so the two can butt against but not connect |
 IMG_8133.JPG |
 Added styrene rims, railings |
 Added additional platform on leg |
 Freshly painted bins, legs, loading dock |
 Bins in place |
 Motor drive end added on |
 IMG_8139.JPG |
 IMG_8140.JPG |
 IMG_8141.JPG |
 IMG_8142.JPG |
 IMG_8143.JPG |
 IMG_8144.JPG |
 IMG_8145.JPG |
 IMG_8146.JPG |
 IMG_8147.JPG |
 IMG_8148.JPG |
 Cardboard office mock-up next to finished styrene building |
 The whole thing! |
 The whole thing! |
 The whole thing! |
 New Truck Dock |
 IMG_8154.JPG |
 IMG_8154.JPG |
 Truck loader painted Floquil new concrete |
 Brass parts constructred for truck loader |
 Truck loader in place |
 IMG_8158.JPG |
 Note "poured" concrete weathering! |
 IMG_8160.JPG |
 IMG_8161.JPG |
 IMG_8162.JPG |
 Best view of truck loading chute |
 IMG_8164.JPG |
 Beginning to hide A-C duct |
 Removed offending 2x4, smoothed out |
 Side view of duct hider |
 More joint compound! |
 Duct cover side in place. |
 Overall view |
 How I got to the layout rear |
 Painted sky blue |
 Head-on view of painted cover |
 Countour-early |
 Countour in progress |
 Countour in place, cut for doorway |
 Wood shaper to hold contour up |
 What I had to cut out! |
 Small triangle being glued |
 Styrene side in place |
 Finished backdrop |
 Finished backdrop |
 Finished backdrop |
 Finished backdrop |
 The New England Meet Boys visit! |
 Tru-Scale removed, roadbed and Peco tried in place |
 More distant view of work area |
 Taylor Yard Ladder removed! |
 Peco turnout ready to install |
 Code 100-83 soldered segments |
 Close-up, yes the heights match, different profiles on rail! |
 Stock Peco and mounted, ready to install version |
 Mike Rose Hobbies site |
 View of replaced Taylor Ladder |
 Port of Erin left side track re-alignment |
 Port of Erin right side track re-alignment |
 New Mehoopany Peninsula "kit" |
 Assembling Peninsula |
 Mehoopany new peninsula "spine" in place |
 Using Peco Code 83 templates |
 Using Peco Code 83 templates |
 Using Peco Code 83 templates |
 Using Peco Code 83 templates |
 Using Peco Code 83 templates |
 Using Peco Code 83 templates |
 Expanding the peninsula |
 Making a "blob" with cubes |
 30-yr. old Baltic Birch plywood--the best! |
 Future "return route" of main behind viaduct |
 "viewing port" cut into hillside to help in the installation of new hidden track connection |
 View of Meshoppen |
 New location of Kintner Milling |
 Peninsula End View |
 "Charmin Yard" |
 Alternate Kintner Milling view |
 Tele shot of main line turnouts from under the viaduct |
 Note opening at end in retaining for new mainline hidden track |
 Triumphant wave of hand from view port! |
 Future East Yard |
 IMG_8581.JPG |
 IMG_8582.JPG |
 IMG_8583.JPG |
 IMG_8584.JPG |
 IMG_8585.JPG |
 IMG_8586.JPG |
 IMG_8587.JPG |
 IMG_8588.JPG |
 IMG_8589.JPG |
 Old turnout removed |
 Two tracks where there was one |
 Ripped up! |
 A very careful transition from old to new |
 Close up of transition joint |
 IMG_8595.JPG |
 Cleaned-up right of way |
 Cleaned-up right of way looking left to bridge |
 Removing old Luan |
 Using new tool to remove Luan piece |
 Luan piece removed |
 Using a scraping chisel to smooth the area |
 New Luan |
 Close up of Luan bridge piece |
 Close up of other Luan piece and Peco turnout templates |
 Luan jig saw puzzles |
 Scribing the new piece for East Yard |
 Definitely a luan jig saw puzzle |
 Luan in place |
 Luan for the future Charmin' Yard |
 Rounding the peninsula end with more luan |
 Meshoppen now has roadbed! |
 More cutting and fitting |
 The final piece |
 All main line luan now in place |
 Breaking The Main Line |
 Removing old sub-roadbed |
 Old sub-roadbed gone |
 New roadbed for rear track |
 Modified upper main riser |
 View of truncated old roadbed |
 Trying the new curved turnout in place |
 Underground sub-roadbed, ready for track |
 Close-up of luan laminated portion |
 Peco and Custom Trax |
 Close-up showing feeders attached |
 Finished underground connection piece, ready to install |
 Future East Yard, now with an extra track |
 Laying out the yard ladder and main |
 Infrastructure 101 |
 Infrastructure 102 |
 Infrastructure 103 |
 Infrastructure 104 |
 Viewport now no longer needed |
 Land ho! |
 Creating the tunnel portal |
 Walthers Double Track Through Truss Bridge |
 Bridge placement |
 Tunnel Liner Supports |
 Tunnel Liner |
 Double stack clearing the tunnel |
 Distant view showing the tunnel liner |
 Close up view of lined tunnel |
 Laying out the curves |
 Tank Farm and Sludge Track |
 Plant leads and West Yard |
 Crossing close up |
 Another view of West Yard |
 Revised underpass area |
 Close up of re-located first turnout |
 Another view of East Yard |
 Modified view |
 Mehoopany Proto Photo Scan |
 Mehoopany Proto Track Diagram |
 Changed track arrangement yet again |
 Close up of changes made to switching lead |
 Alternate view of latest track adjustments |
 "Stock Prep" and chemical unloading area, sludge track on right |
 West "Charmin" Yard, two warehouse track pairs |
 "Stock Prep" and chemical unloading area, sludge track on right |
 Reverse view |
 New arrangement with "buildings" |
 New Tank Farm arrangement |
 New Prep Track arrangement |
 Modified warehouse track arrangement |
 Modified building arrangement |
 Aerial view of truck dock and West Yard |
 Plywood Origami |
 One-Pc-Luan-Cut-Out |
 Using roadbed as template |
 View of future in-plant double sidings and West Yard |
 Main, siding, and West Yard roadbed |
 Meshoppen roadbed and new alignment for sidings |
 Another view of Kintner Milling at Meshoppen |
 And now it's all cut out! |
 End of peninsula view of Meshoppen/Kintner Milling |
 West Yard |
 End of West Yard, view of Meshoppen |
 View of West Yard and plant sub-roadbed in distance. |
 Roadbed on top of sub-roadbed, all cut out. |
 Gluing it all together. |
 Reverse angle of weights and clamps |
 Continuing around the curve with road bed glue-up |
 CV Turnout strips |
 Main Line being installed from East Yard towards the crossovers |
 "Aerial view" of turnouts under construction |
 Taking shape; multiple curved turnout beds ready for rail |
 Opposite view of crossing area |
 Close up of turnouts under construction |
 Opposite crossover view |
 #8 curved turnout under construction |
 Gluing Meshoppen road bed |
 Gluing the two double warehouse track road beds |
 Overall view showing progress to date |
 Continued progress on "Robinson's Crossover" |
 Gluing Kintner Milling at Meshoppen |
 Curved turnout base at Meshoppen |
 Alternate view of future site of Kintner Milling at Meshoppen |
 Double track at Skinner's Eddy |
 View of East Yard turnouts and tail track, cut in |
 East Yard--first locos and cars! |
 "normal" view of East Yard |
 Jim's madness |
 Cars in East Yard |
 Another view of East Yard, spiked |
 New tunnel liner in place, location tested |
 Jim Lincoln's now famous hand |
 The results of Jim's Madness--Really Good Looking Track |
 The wood ties and tie plates are killer! |
 I like the way the ballast cars snake into East Yard |
 Conrail ML-something passing East Yard |
 East Yard closer-up |
 Chemical Yard with curved turnout ties tacked down |
 Crossing template |
 "normal" view of Chemical Yard |
 "lump" behind Chemical Yard |
 Rear main hidden from view by "lump" |
 Skinner's Eddy industrial lead |
 Another view of Skinner's Eddy Industrial Lead |
 Custom Crossing in place |
 Turnout leading into crossing |
 Turnouts under construction for warehouse leads |
 Turnout Progress |
 Turnouts leading to crossing |
 Jim's CAD drawing of Chemical Yard |
 Better view of CAD drawing |
 Inner turnouts now in place! |
 The Man Himself, at work |
 Beginnings of Meshoppen Creek |
 Lower angle view |
 First switch at East Yard! |
 "Inside" view of the proposed Meshoppen Creek abutments |
 Opposite angle view, from the Mehoopany side |
 Advancing onto the first set of warehouse tracks |
 Opposite view of newly installed warehouse track |
 Live track |
 One more "aerial" |
 First cars at Warehouse K&L |
 New warehouse tracks without cars |
 Backdrop planning |
 More view block |
 New Meshoppen concept |
 View towards Meshoppen from Skinners Eddy |
 Meshopen low angle |
 "Aerial" view of the new Meshoppen concept |
 Instant Yard Ladder |
 Close-up of new Chemical Farm yard ladder |
 Meanwhile, back at Meshoppen |
 Yes, it was a good installation |
 Opposite view of long Meshoppen incline |
 The Maestro at work |
 Progress on the Chemical Farm yard lead |
 New "spine" backdrop from Mehoopany side |
 Both pairs of warehouse tracks now in operation |
 The Cut at Meshoppen |
 New spine from the Meshoppen side |
 Adding the river and embankment support |
 Close-up of Meshoppen and future river bank. |
 View of incline to Meshoppen and Kintner Milling |
 Opposite view of long Meshoppen incline |
 Chemical yard firms up |
 Staggered spine supports |
 Back view of Meshoppen Creek |
 Complex track work |
 Opposite view of complex switch work |
 Chemical yard |
 Another view of the chemical yard and proposed culvert |
 "Looking at Charmin' Paper Mill" shot |
 Now you can see the dished nature of the backdrop |
 Meshoppen with backdrop |
 Expanding the chemical yard at Mehoopany |
 Bridge abutment prep work |
 Low angle view |
 Aerial view of right hand abutment modification process |
 Left hand top-down view |
 More on the left hand side |
 New sub-roadbed adapter |
 Now for the roadbed |
 New turnout for the crossover |
 New roadbed mates with plaster retaining on left hand abutment |
 Cutting the plaster retaining |
 Curved turnout traced |
 Shims for abutment |
 Angle bracing |
 Overall view of construction area |
 Turnout roadbed now trimmed to fit |
 Overall view |
 Constant trying and fitting for accuracy! |
 Another view of the Jim Lincoln Track Laying Machine at work! |
 Plywood sandwich |
 After the glue has set, the completed assembly is ready for installation. |
 Reverse view showing actuator slot |
 Rear support for plaster retaining |
 Retaining now supported front by abutment and at the rear |
 Low angle view |
 Eureka moment! |
 Modified bridge track |
 Close up of old problem and solution |
 West Yard complete |
 Another view of completed West Yard trackage. |
 Initial abutment coloring |
 Close up with cars on the bridge |
 The abutment is now in place |
 Higher angle view |
 Overview showing painted track |
 Lower angle view |
 Left abutment now Sculptamolded in place |
 Of course I had to see it with the bridge in place! |
 Alternate view |
 Time to patch the holes! |
 I altered the river bend and covered up the old portal |
 Hot glue fastens all the pieces firmly and easily,. |
 What a difference "opaque" makes! |
 I really like the new contours here. |
 Compare this to earlier views. |
 West Yard filled to capacity |
 All track in this view live and usable. |
 Chemical Yard now in place |
 Three right hand tracks not yet spiked |
 This industry soaks up a lot of cars! |
 Golden Spike! |
 Close-up of slide switch for turnout control |
 Side view of slide switch and custom mounting |
 Underneath view of polarity switching slide switch (macro) |
 Meshoppen with all tracks in place and powered! |
 "Aerial" of Meshoppen with all tracks in place |
 Alternate view of Meshoppen with all tracks in place. |
 Side view of Meshoppen |
 Carved out ditches |
 No more white |
 Other side of bridge |
 More pre-dirt. |
 Things look so much better with real dirt! |
 Green applied |
 Green & bridge in place |
 Ballasted turnout |
 Westbound empty ballast train on bridge |
 Under-bridge view |
 Helicopter shot of train on bridge |
 Braces added to riverbed along Mehoopany |
 More riverbed near East Yard |
 Close up of riverbed termination near East Yard |
 Almost done |
 Note how 2" verticals have been added to support the fascia |
 Riverbed along Meshoppen |
 Skinner's Eddy riverbed |
 Turnout controls |
 Switch mounting methodology |
 Z-scale throwbars, electrical switch in place |
 Roadbed prepped for switches |
 Chemical Yard slide switch installation |
 View of prepped spot without the switch in place |
 Soldering points to Z-scale throwbar |
 Tinning the throwbar |
 Tinning the wider throwbar segment |
 Drilling the hole for the slide switch knob |
 Extended length Z-scale PC tie throwbar |
 Trimming the slide switch knob |
 Throwbar in place |
 Throwbar trimmed |
 Pile o' tools! |
 Meshoppen area clean-up |
 Pittston area clean up |
 Continued clean-up |
 West Yard area clean up |
 West Yard clean-up |
 Ceiling Tile "Ground" |
 All Mehoopany Ground In Place |
 Styrene spine backdrop painted |
 Meshoppen spine cut and in place |
 Styrene backdrop from Mehoopany side |
 Spine behind Mehoopany |
 From Meshoppen side, view of styrene blue painted sky |
 Alternate view at Meshoppen |
 Newly puttied seam at Mehoopany backdrop |
 Filling in the right hand 3D hill |
 Filling in 3D hill remainder behind West Yard at the cut |
 Overview at Meshoppen of hill shapers |
 Left hand side of Meshoppen showing transition to viaduct |
 Opposite view at Meshoppen showing shapers in place |
 Overall view of Meshoppen with hill shapers in place |
 Enough tape? |
 Beginnings of hill side on left |
 Ground level view |
 More foam on left |
 Foam on right |
 Mehoopany Right hand side foam finished |
 Right hand foam close-up view |
 Mehoopany left side foam guides |
 Mike Confalone (tm) View |
 Screen added to peninsula end |
 Meshoppen with screen |
 Screen hillside behind Kintner Milling |
 Full spine shot with screen |
 End of Meshoppen where it attaches to layout, with screen |
 Testing retaining wall placement |
 Another view of retaining wall |
 Gluing the wall addition together |
 Left hand access road in place, screen completed |
 Access road |
 New retaining wall in place |
 Extended retaining wall in place |
 Black plastic protecting the photo backdrop |
 Screen work in progress on the right side of Mehoopany |
 All screen complete, ready for plaster cloth! |
 First plastering |
 Plaster now around the back of the first efforts, on the Meshoppen side |
 View from behind workbench showing peninsula end |
 Finished plastering Mehoopany left side |
 Overall peninsula view from Skinner's Eddy |
 Dirt! |
 End view of dirt ground cover |
 Mehoopany right hand side with dirt |
 Embankment work at Mehoopany |
 Green on right hand side hill behind Mehoopany |
 Riverbank formers under construction |
 Formers in place at the "cut" |
 Peninsula end view of the new cut hillside formers |
 Overall end view of the peninsula showing a hard day's work. |
 Meshoppen left side hill green-ed |
 Culvert "kit" |
 Hillside end of culvert now in place |
 View looking through the cut. |
 Cut hillside with screen, ready for plaster cloth |
 Peninsula end and riverbank screen in place up to Robinson's Crossovers |
 Culvert installation |
 Culvert being glued in place. |
 Meshoppen river embankment foam formers in place |
 Elevated shot showing the foam formers between Kintner Milling and the main line. |
 Alternate view of Meshoppen, ready for screen and plaster. |
 Meshoppen Kintner to main line formers, different view. |
 View of future Mehoopany Creek, showing relationship to foreground "cut" hillside. |
 Embankment at West Yard Mehoopany, ready for plaster |
 Meshoppen embankment, ready for plaster |
 Screen, then plaster |
 Meshoppen plastered |
 Cut plastered |
 This is what still needs screen and plaster |
 Plaster along West Yard in Mehoopany |
 Looking east from West Yard |
 Dirt again! |
 Everything plastered now dirt-ed |
 Everything dirt-ed now green! |
 Green along West Yard |
 Meshoppen greened |
 Culvert retaining wall, stone retaining wall |
 Full screen all the way to the bridge now, ready for plaster |
 Low angle shot to show contours |
 Reverse angle shot of new retaining walls and screen |
 Note the road bridge abutment, and how the screen dies into the old rocks on the far left |
 Culvert rocks in colored Celluclay |
 Mehoopany Creek with rocks and colored Celluclay |
 Higher view of creek and rocks |
 Access road |
 Access road view from Mehoopany West Yard |
 Extending the finished area towards the original layout |
 Alternate view of newly river embanked Meshoppen area |
 Tie in to original scenery |
 Finished scenery Stage 1 at Meshoppen from Skinner's Eddy |
 Embankment below Meshoppen |
 Meshoppen peninsula end view from workbench |
 Trees in place! |
 Another view of Mehoopany right hand side with a few trees |
 Backdrop photo with 3D scenery for the first time |
 Attempted full backdrop shot |
 Meshoppen view of treed hillside. |
 Riverbed in place! |
 Riverbed panorama. |
 Peninsula end view showing wrap-around riverbed |
 Meshoppen panorama |
 Rix road bridge segment |
 River bed in place all the way past the two track through truss bridge |
 Road bridge close-up |
 Overhead view of bridge abutment work sans bridge for clarity |
 Underside of bridge with shoes, painted |
 Ditch work at East & Chemical Yards |
 The Culvert |
 Culvert ditch base |
 Pipes for the road culvert |
 Culvert face and wing wall base |
 Completed culvert in place. |
 Culvert ditch ready for screen wire. |
 Final screen wire in place |
 Track taped for protection, ready for plaster cloth |
 Ditch with plaster as well as brown Sculptamold covering. |
 Culvert mouth with plaster and colored Sculptamold in place. |
 Better view of rear ditch/stream |
 First segment of finished fascia attached |
 Track tape largely removed |
 Finished fascia down to West Yard |
 Overview of Meshoppen with finished riverbed and no track tape |
 Modified scenery here at Skinner's Eddy (less rock), no tape |
 Sharp radius fascia |
 Clamp-less final fascia |
 Styrene fascia insert, in place. |
 Gluing the Skinner's Eddy fascia |
 Close-up showing clamping and bracing used. |
 Port of Erin left side |
 Correcting and old problem |
 Port of Erin left side with finished fascia being glued in place. |
 Finished fascia at Skinner's Eddy |
 Gluing ceiling tiles at Mehoopany |
 Gluing down the area adjacent to West (Charmin) Yard |
 Most tiles glued down, gluing the tiles to the pop-up hatch. |
 The Cider Mill Office has arrived! |
 Cider Mill Office--alternate view |
 Cider Mill office, yet another view |
 A lonely office |
 This view is from near the cut between Mehoopany and Meshoppen. |
 Using the hatch |
 Open hatch. |
 Scribing the foam |
 First foam filler piece |
 Last foam filler cut to fit (in rear) |
 Gluing them together |
 Foam glued and ceiling tile cracks filled with Sculptamold. |
 More Sculptamold used for land contouring |
 Final ground in place and all cracks filled |
 More sculpting |
 Sculpting of terrain extended towards the foreground. |
 Opposite view. |
 Leveled stream bed |
 Removable hatch now painted and sealed. |
 Foam transition piece with dirt |
 Foam transition piece with added green ground cover. |
 Ground cover and dirt road added next to Kintner siding at Meshoppen. |
 Footprint of Mehoppany plant designed. |
 Cardboard mock-up in progress. Note cars inside building. |
 Roof added to mock-up. |
 Loading dock planning. |
 Alternate view showing entire facility mock-up. |
 Coffee can used as future tank stand-in. |
 Manufacturing section of plant. |
 Alternate view of shipping side of plant. |
 Building and track purpose change |
 Tank cars on newly designated sludge track. |
 Another view of Chemical Yard |
 Low angle view of shipping/warehouse and Cider Mill Office. |
 Alternate low angle view of shipping and warehouse area. |
 Another low angle, more central view. |
 Playing with photo angles. |
 Ballasting |
 Ballasted main line, mostly dirt on siding |
 Drainage ditches filled in at Mehoopany |
 Fish-eye view |
 Another view of Mehoopany overall |
 Mehoopany Creek needs a bridge! |
 Road bridge stub in place at Skinner's Eddy |
 Getting the bridge in place |
 Bridge girder in place at Mehoopany Creek |
 Protecting the slide switch |
 Another view of the slide switch protectors |
 Like I said, there were a lot of them to build! |
 Slide switch protectors in the Chemical Yard area |
 Ballasting and scenic materials make a huge difference. |
 Ballasted crossing |
 West yard and the sidings up to the paving and grade crossings now ballasted. |
 Rock cut area |
 Surface removed, foam exposed. |
 I used a hot knife to take about half an inch off the foam risers. |
 Rock temporarily tried in place. |
 Testing clearances. |
 West Yard Ballast Close-up |
 Mehoopany East End |
 Existing rocks at West Yard area cut blended in |
 Close up of blended rocks |
 Another view of cut |
 Green ground cover added |
 Blending largely complete |
 Adding more trees and shrubs. |
 Chemical Yard ballasted, along with main line and East Yard Ladder |
 Beginning of roads at Mehoopany |
 Cutting out the Gator Board |
 Base of building |
 Assembling the building |
 Continuing the assembly |
 Internal reinforcements in place |
 Opposite view |
 New building core in place, second building footing cut out in styrene |
 Overhead of new buildings from West Yard angle |
 View of new tank and newly cut out warehouse footing |
 Taken from mid-peninsula |
 East Yard view of complex |
 One last view from the west |
 The giant planning mess |
 Warehouse takes shap! |
 Warehouse front |
 Truck loading dock |
 Warehouse rear |
 Sunday's final result |
 P&G Warehouse |
 Front warehouse view |
 Taping for brick painting |
 Much painting completed |
 Higher angle view of roof supports |
 Warehouse with cars inside to show where they are located |
 Roof on! |
 The roof is not glued on yet, but once it is, I'll be adding corrugated metal along the top where you see white. |
 Rail dock loading "liners" |
 Completed dock liner |
 End view |
 Also working on the manufacturing plant building |
 Loading dock liners with doors cut out |
 One wall has no cut outs |
 Car inside, doors installed |
 Better picture, more distant view |
 Overhead view of liners before roof is installed |
 Another overhead view |
 Gluing the roof on |
 Another upside down view showing more weights |
 Upside down view showing loading dock doors inside |
 Making a 90 degree corner |
 Gluing up the right hand side of the plant |
 Over head view |
 Foundation glued in place |
 Compare with stock piece below |
 Magnets holding glued foundation |
 Another wall technique |
 Gluing up last front side of plant |
 Masking to paint the newly made sides |
 Cutting the facade for the loading track entrances |
 Working on a large structure |
 Rear wall of structure |
 Overall view on table saw of warehouse with facade |
 Low angle view |
 Rear corner view |
 Overhead view |
 Building so far in place on the layout. It's shaping up! |
 Front, low angle view |
 Overall roof shot |
 Future truck dock wall tried in place on plant building |
 Using a compass to accurately mark the loading door locations |
 Receiving wall with Pikestuff doors in place |
 Manufacturing railroad receiving doors |
 Doors from Walthers Medusa Cement |
 Before (on left) and after |
 Railroad receiving doors in place |
 Slightly different view of railroad receiving side. |
 Getting ready to assemble |
 Final shot |
 Stairs and railings |
 Truck loading dock plates |
 Openings cut for truck dock plates |
 Material removed from window and door areas prior to attaching walls |
 Railings fabricated (close up) |
 IMG_9178.JPG |
 Attaching manufacturing building walls |
 What I'm up against! |
 Gluing on the other building sides |
 Wall cap and trim details in place |
 Left side view of roof cap in place. |
 Time to ballast the interior tracks |
 Re-lay of plant pulp siding |
 One roof option |
 Or, keep all the lines with right angles except at the bends |
 Chemical Yard and straightened siding |
 Overall shot of manufacturing building |
 Cider Mill Office has moved! |
 Another view of relocated Cider Mill Office |
 Warehouse with ballasted tracks, grade crossings fixed up too. |
 Overall view of Cider Mill Office relocated |
 Overall view from above West Yard |
 Aerial view above West Yard |
 Relocated Cider Mill Office |
 Dave & I both think this location makes more sense. |
 Warehouse Overall from West Yard |
 Manufacturing building showing pulp track boxcars in place |
 Another wide angle view |
 Sludge Track and Cider Mill Office in new spot |
 Warehouse with cars inside |
 Warehouse-Manufacturing-Tank view from West Yard |
 Another low angle, wide angle view |
 View of Cider Mill Office and Manufacturing |
 Cider Mill Office and Sludge Track |
 Plant Roof Dividers in place |
 Plant Roof Styrene--making removable panels |
 WhatsNext-Kitbashing the roof details |
 DSCF0456.JPG |
 DSCF0457.JPG |
 DSCF0458.JPG |
 DSCF0459.JPG |
 DSCF0460.JPG |
 DSCF0461.JPG |
 DSCF0462.JPG |
 DSCF0729.JPG |
 DSCF0730.JPG |
 DSCF0731.JPG |
 DSCF0732.JPG |
 DSCF0733.JPG |
 DSCF0734.JPG |
 DSCF0738.JPG |
 DSCF0739.JPG |
 DSCF0740.JPG |
 DSCF0741.JPG |
 DSCF0742.JPG |
 DockZoomWhse.jpg |
 IMG_9203.JPG |
 IMG_9204.JPG |
 IMG_9205.JPG |
 IMG_9206.JPG |
 IMG_9207.JPG |
 IMG_9208.JPG |
 IMG_9209.JPG |
 IMG_9210.JPG |
 IMG_9211.JPG |
 IMG_9212.JPG |
 IMG_9213.JPG |
 IMG_9214.JPG |
 IMG_9215.JPG |
 IMG_9216.JPG |
 IMG_9217.JPG |
 IMG_9218.JPG |
 IMG_9219.JPG |
 IMG_9220.JPG |
 IMG_9221.JPG |
 IMG_9222.JPG |
 IMG_9223.JPG |
 IMG_9224.JPG |
 IMG_9225.JPG |
 IMG_9226.JPG |
 IMG_9227.JPG |
 IMG_9228.JPG |
 IMG_9229.JPG |
 IMG_9230.JPG |
 IMG_9231.JPG |
 IMG_9232.JPG |
 IMG_9233.JPG |
 IMG_9234.JPG |
 IMG_9235.JPG |
 IMG_9236.JPG |
 IMG_9237.JPG |
 IMG_9238.JPG |
 IMG_9239.JPG |
 IMG_9240.JPG |
 IMG_9241.JPG |
 IMG_9242.JPG |
 IMG_9243.JPG |
 IMG_9244.JPG |
 IMG_9245.JPG |
 IMG_9246.JPG |
 IMG_9247.JPG |
 IMG_9248.JPG |
 IMG_9249.JPG |
 IMG_9253.JPG |
 IMG_9254.JPG |
 IMG_9255.JPG |
 IMG_9256.JPG |
 IMG_9268.JPG |
 IMG_9269.JPG |
 IMG_9270.JPG |
 IMG_9271.JPG |
 IMG_9272.JPG |
 IMG_9282.JPG |
 IMG_9283.JPG |
 IMG_9284.JPG |
 IMG_9285.JPG |
 Whoops, this isn't Meshoppen! |
 IMG_9287.JPG |
 IMG_9288.JPG |
 IMG_9294.JPG |
 IMG_9295.JPG |
 IMG_9296.JPG |
 IMG_9297.JPG |
 IMG_9298.JPG |
 IMG_9299.JPG |
 IMG_9300.JPG |
 IMG_9301.JPG |
 IMG_9302.JPG |
 IMG_9303.JPG |
 IMG_9304.JPG |
 IMG_9306.JPG |
 IMG_9307.JPG |
 IMG_9308.JPG |
 IMG_9309.JPG |
 IMG_9310.JPG |
 IMG_9311.JPG |
 IMG_9312.JPG |
 IMG_9313.JPG |
 IMG_9314.JPG |
 IMG_9315.JPG |
 IMG_9316.JPG |
 IMG_9317.JPG |
 IMG_9318.JPG |
 Mainline re-route (Before) |
 Left side before view of main line re-route |
 Former Engine Terminal Area-before demolition |
 Engine Terminal (panning right) |
 Long Shot of former Hammill Yard looking north |
 Last train out of Hammill Yard |
 IMG_9525.JPG |
 IMG_9526.JPG |
 Last cars in yard |
 Removing the electrical infrastructure prior to demolition |
 Rails removed prior to saw cuts (South Ladder) |
 No more control panels |
 Rails removed prior to saw cuts (North Ladder) |
 Weapons Of Mass Destruction! |
 Gone baby gone! |
 Looking south. |
 Kinter Milling progress |
 Kintner close-up |
 Old Engine terminal and underground turnback loop removed |
 Another view of former engine terminal area |
 View of former engine terminal area looking south |
 View towards the former North Ladder |
 Scenery removed up to the beginning of Laceyville at ground level |
 The Wretched Refuse |
 Some of it was even left over from previous remodels! |
 A dramatically different vista |
 This view amazed me |
 Different view of same gash |
 Back to the other aisle |
 Other end of tunnel removed |
 "Aerial" view of half of the former North Ladder in a new location |
 Proposed area to branch off of for the track into Towanda |
 Proposed turnout location |
 Making a mess outside now |
 Close up view of new mainline segment |
 Segment in place--right hand side |
 New main line sub-roadbed in place (view from the aisle near mine) |
 Overall view of new sweeping mainline double track curve |
 View with both portals |
 A little more spline to be removed |
 Ready for plywood and the raising of the riser |
 Trying the grain mill in place |
 View of arrival/departure track pair in foreground |
 View looking back toward the old "port of Erin" area |
 Lots of right hand real estate |
 View of mill tracks and R/D tracks looking south |
 Connection to former Erin trackage |
 Removable hatch removed! |
 Velux window controls re-located |
 Old seam with old mesh tape removed |
 First coat of mud |
 The beginning of an invisible seam |
 Spiking the Vosburg Tunnel track prior to installation of the sub-roadbed |
 Tunnel liner end of Vosburg Tunnel track |
 Vosburg Tunnel track installed! |
 Close up view of the track just inside the tunnel. |
 The importance of sufficient clamps |
 The final connection on the left |
 It's now in place: 32 feet of new Vosburg Tunnel track |
 Staging Yard--empty and clean! |
 Curved Portion of Staging Yard |
 Looking the Opposite Way |
 Mehoopany and East Yard, Sans Cars |
 New Towanda Yard |
 New Towanda Yard, Opposite View |
 Towanda Yard Ladder |
 New Trackage and Old, plus Masonite Sidings |
 How New Tracks Tie Into the Old |
 Laceyville Agway |
 Feed Mill Laceyville_0001-Wayne Sittner 84-85.jpg |
 IMG_9967.JPG |
 IMG_9968.JPG |
 Laceyville Agway (reverse view) |
 Wyalusing Purina Feeds Mock-Up |
 Wyalusing Purina Feeds Mock-Up |
 Wait--what happened here? Where's Laceyville?!! |
 IMG_9973.JPG |
 IMG_9974.JPG |
 IMG_9975.JPG |
 IMG_9976.JPG |
 IMG_9977.JPG |
 IMG_9978.JPG |
 First new layer: 1" foam |
 Second Layer: 1/2" foam |
 Drawing on the joists so I know where the screws go |
 Ready to apply the glue |
 Groove cut into existing foam to accept 1" foam connector |
 Village planning |
 Amazing construction mess |
 Background hillside under construction |
 Hillside in place! |
 Nice to be rid of that big hole! |
 Hillside almost complete |
 Hillside ready for painting |
 Laceyville town view |
 Looking into Laceyville from Wyalusing |
 IMG_9995.JPG |
 IMG_9996.JPG |
 IMG_9997.JPG |
 IMG_9998.JPG |
 IMG_9999.JPG |
 Track removed |
 Some material will be reclaimed |
 Last section to be removed |
 This shot specifically for Mike Confalone! |
 Washed track |
 Ready to start building |
 Semi-fancy brace |
 New bench work, looking south |
 New benchwork, looking north. |
 New Risers and Joists |
 Support legs in place, removable bench piece in front of Well Trol installed. |
 Metal legs instead of wood |
 John V. shot! |
 Smoothing off the tank! |
 The vanquished nut |
 Track planning results |
 Proposed Tunkhannock track arrangement |
 Future Tunkhannock |
 Looking towards Ransom |
 The former arrangement for the removable bridge |
 From Ransom, looking across the aisle, through the shelving, at the new alignment |
 Uh oh, where is this? |
 Looking up at the track that is to be lowered, against the wall. Complex under there! |
 Another look at the underneath of the to-be-lowered sub roadbed. |
 Old sub roadbed now aligns with Tunkhannock plywood! |
 Removed foam to get to the actual bench work. |
 Testing with cardboard. |
 Splice plate for new connection |
 Looking through the shelving from the sink area, at the eventual destination of the new bridge. |
 Mocking up the drop of the bridge with cardboard |
 Carefully marking where the plywood connects to Ransom on the hinge side |
 Hing side plywood cut out. |
 Filler piece cut and in place. |
 New right of way to drop bridge, seen from sink location. |
 Plywood between Ransom and Tunkhanock cut to fit |
 Old "Grainzilla" road and ground cover cleared for new track coming off bridge. |
 Complex supports for bridge hinge side |
 Underneath view of 2x4 hinge side supports. |
 Vertical grain fir piece before trimming to length. |
 Using bridge "land" plywood to mark fir piece for trimming. |
 Trimmed fir. |
 Ready to screw it all together and mount the hinge! |
 Drop bridge with proper hinge |
 Support in place for latch side of bridge |
 Ready to lay track! |
 A 2" cleat reinforces the bridge and the new roadbed through the shelving. |
 Replacing foam and fascia |
 Latch side and how the roadbed is attached. |
 Fastening Sub-Roadbed |
 Custom piece to join new sub-roadbed to old |
 Brace from old benchwork to new joists |
 Extended Custom Trax used in staging across the bridge |
 Track across bridge onto the "mainland" |
 Looking towards Ransom |
 Main line from bridge passing by Ransom |
 Full main line cut and fit! |
 Clamping Custom Trax while gluing |
 View of glued up track through shelving |
 Glued bridge track |