Note how I simply drilled holes right through the "concrete" pad, and made up five brackets out of brass strip stock, as the pipe holding device. These were Cyanopoxied in place after I used the same glue to attach the flanges to the silos. You can see some of the brackets extending right through while the adhesive sets (about 30 seconds to be sure).