 Stone in work |
 Staining the front gable with the help of the backhoe and a 10' ladder |
 View from below the backhoe |
 The wall has been repaired... |
 Stone with trim pieces |
 Front porch and one of the corner columns |
 The trim work started for the metal roof and the painting is complete |
 The metal panels that will make up the roof |
 The longest ones are about 30' long |
 The panels were all around the house as well as inside |
 Trim work on west side of hours |
 Trim on east side of the garage |
 Roof panels going up on the back of the house |
 The east side is finished |
 The front dormers and gable is finished |
 The front still has a ways to go |
 Closeup of the front gable |
 View of the new roof from the road down to the lake |
 View from front |
 Close up of dormer and gable |
 Gable windows are finally installed! |
 Paul started installing the wood ceiling outside |
 The cedar trim is up on the front porch |
 The trimwork is finished on the corner posts |
 The wood under the front gable is over half way on one side |
 Another view of the wood under the gable |
 Finishing the last of the exterior trim |