Steve Bloomfield | profile | all galleries >> Construction of the Vista Ski Lodge >> Vista Ski - Roof and Stone tree view | thumbnails | slideshow

Vista Ski - Pre-construction pictures | Vista Ski - Construction of the retaining walls | Vista Ski - Foundation | Vista Ski - Framing | Vista Ski - Dry In | Vista Ski - Roof and Stone | Vista Ski - Interior | Vista Ski - Cabinets and Floors | Vista Ski Finish Work | Some pictures of the finished (almost) product

Vista Ski - Roof and Stone

The stone work started the first week in August and the roof started the week of the 20th of August and should be done by the 7th of September. The metal roof work is very labor intensive taking 4 weeks to complete. The painting was completed the week of August 13th. The large triangular windows were installed and the roof was completed the week of Sept. 17th to finally complete dry in.
Stone in work
Stone in work
Staining the front gable with the help of the backhoe and a 10' ladder
Staining the front gable with the help of the backhoe and a 10' ladder
View from below the backhoe
View from below the backhoe
The wall has been repaired...
The wall has been repaired...
Stone with trim pieces
Stone with trim pieces
Front porch and one of the corner columns
Front porch and one of the corner columns
The trim work started for the metal roof and the painting is complete
The trim work started for the metal roof and the painting is complete
The metal panels that will make up the roof
The metal panels that will make up the roof
The longest ones are about 30' long
The longest ones are about 30' long
The panels were all around the house as well as inside
The panels were all around the house as well as inside
Trim work on west side of hours
Trim work on west side of hours
Trim on east side of the garage
Trim on east side of the garage
Roof panels going up on the back of the house
Roof panels going up on the back of the house
The east side is finished
The east side is finished
The front dormers and gable is finished
The front dormers and gable is finished
The front still has a ways to go
The front still has a ways to go
Closeup of the front gable
Closeup of the front gable
View of the new roof from the road down to the lake
View of the new roof from the road down to the lake
View from front
View from front
Close up of dormer and gable
Close up of dormer and gable
Gable windows are finally installed!
Gable windows are finally installed!
Paul started installing the wood ceiling outside
Paul started installing the wood ceiling outside
The cedar trim is up on the front porch
The cedar trim is up on the front porch
The trimwork is finished on the corner posts
The trimwork is finished on the corner posts
The wood under the front gable is over half way on one side
The wood under the front gable is over half way on one side
Another view of the wood under the gable
Another view of the wood under the gable
Finishing the last of the exterior trim
Finishing the last of the exterior trim