 Paul and Carol take a break for lunch |
 The ceiling fan in the master bedroom |
 The living room ceiling fan (blades are on order) |
 Paul wiring the double oven |
 Oven installed, but the cabinet cutout is too big so it will have to be fixed |
 Laundry closet shelving and trim are done |
 Laundry sink and faucet |
 Water softener and pressure tank are hooked up in the garage |
 Front bedroom closet shelves and trim |
 Dining room light is installed |
 Forms for the sidewalk and driveway |
 Gutters are now installed |
 Water proof coating on the guest bath before starting to tile |
 Benny and Walter are never inclined to help out when there is work to be done! |
 Carol sprays the interior doors "Creme" |
 Steve is tiling the guest tub surround |
 Paul is putting up shelving in the master closet |
 Paul cutting shelving material on the newly poured driveway |
 Guest shower is coming along nicely |
 Whose idea was it to have all of these shelves?! |
 Finally got the fan blades on the living room ceiling fan |
 The new driveway and the first snow on the house |
 We got the microwave on 3/7/08 |
 and the washer and dryer |
 The molding is in in the back bedroom |
 Just need to grout the guest bath tub |
 The refrigerator was delivered Saturday 3/8 |
 We spent our first night in the house on March 8th |
 We started installing the laminate in the dining room |
 Benny and Walter try out the new flooring |
 View of the living room from the dining area |
 Grout is done in the guest bath |
 View from the front door into the kitchen |