Paul and Carol take a break for lunch |
The ceiling fan in the master bedroom |
The living room ceiling fan (blades are on order) |
Paul wiring the double oven |
Oven installed, but the cabinet cutout is too big so it will have to be fixed |
Laundry closet shelving and trim are done |
Laundry sink and faucet |
Water softener and pressure tank are hooked up in the garage |
Front bedroom closet shelves and trim |
Dining room light is installed |
Forms for the sidewalk and driveway |
Gutters are now installed |
Water proof coating on the guest bath before starting to tile |
Benny and Walter are never inclined to help out when there is work to be done! |
Carol sprays the interior doors "Creme" |
Steve is tiling the guest tub surround |
Paul is putting up shelving in the master closet |
Paul cutting shelving material on the newly poured driveway |
Guest shower is coming along nicely |
Whose idea was it to have all of these shelves?! |
Finally got the fan blades on the living room ceiling fan |
The new driveway and the first snow on the house |
We got the microwave on 3/7/08 |
and the washer and dryer |
The molding is in in the back bedroom |
Just need to grout the guest bath tub |
The refrigerator was delivered Saturday 3/8 |
We spent our first night in the house on March 8th |
We started installing the laminate in the dining room |
Benny and Walter try out the new flooring |
View of the living room from the dining area |
Grout is done in the guest bath |
View from the front door into the kitchen |