Vista Ski - Pre-construction pictures | Vista Ski - Construction of the retaining walls | Vista Ski - Foundation | Vista Ski - Framing | Vista Ski - Dry In | Vista Ski - Roof and Stone | Vista Ski - Interior | Vista Ski - Cabinets and Floors | Vista Ski Finish Work | Some pictures of the finished (almost) product

Vista Ski - Foundation

Piers have been drilled
Piers have been drilled
Foundation forms were set next
Foundation forms were set next
Then the beam trenches were dug
Then the beam trenches were dug
and the under floor plumbing installed
and the under floor plumbing installed
Closeup of the plumbing for the master bath
Closeup of the plumbing for the master bath
Kitchen, laundry, and extra bath plumbing
Kitchen, laundry, and extra bath plumbing
The cushion sand, plastic and rebar are ready
The cushion sand, plastic and rebar are ready
Carol inspects the work
Carol inspects the work
The pour was done on 4/27
The pour was done on 4/27
Carol and the dogs inspect the work
Carol and the dogs inspect the work
You could play tennis except for all of those pipes
You could play tennis except for all of those pipes
What happens when a concrete truck hits a wall.  The truck wins.