 The external AC unit and power is finally hooked up! |
 One of the two tankless water heaters |
 The insulation comes in these containers |
 A radiant barrier (R6) is put up on the ceiling and walls |
 Spraying on the closed cell foam insulation over the radiant barrier |
 The insulation has been sprayed on most of the south side of the roof |
 The A/C ducts and heater unit |
 We installed sound insulation around the office and the master bedroom |
 and also around the extra bathroom and laundry room |
 The insulation is done in the front bedroom |
 Insulation is partway done on the ceiling |
 View of the AC ductwork and insulation over the master bedroom and master bath |
 The outside ceiling fans are ready to be installed |
 Living room and dining room |
 The garage has been sheet rocked and primed |
 Looking into the kitchen area from the living room |
 Dining room and living room |
 Back wall of the gable in front of the kitchen |
 The living/dining area is ready for painting |
 The living, dining, and halls are painted a gold color called "White Raisin" |
 The two extra bedrooms are a light tan "Sand Dollar" |
 Master bedroom done in a light green "Contented". Who picks these color names? |
 Carol masking the walls before we spray the ceilings |
 Benny and Walter are always right there to lend a helping paw as needed |
 The laminate flooring that we will be installing in most areas of the house |