 The Plan |
 A serious remote astro location! |
 Turning the first sod for Eagleview Observatory |
 Site cutting starts |
 Site cut |
 Site cut nearly there |
 Pier footing hole |
 Digging the hole for the telescope support column footing |
 Looking up to the observatory pad from the house |
 Clear open skies |
 Site cut finished...what a View! |
 Road base arrives |
 Pier footing formed up |
 Pier footing formed up |
 True North alignment |
 A beautiful clear day at Eagleview |
 Proposed rebar cage for concrete pier and footing |
 Anchor bolts |
 Magnificent view from the observing site |
 Spreading the road base |
 Spreading the road base |
 Building the path down to the house |
 Observatory site finished |
 Observatory site ready |
 Trees removed revealing this spectacular view! |
 18" F4.1 GOTO Dob |
 Scopedome arrives at Sidereal Trading |
 Scopedome arrives at Sidereal Trading |
 Scopedome arrives at Sidereal Trading |
 Rebar cage for single pour monolithic pier and footing |
 Rebar cage for pier and footing |
 Rebar cage with anchor bolts and template |
 Rebar cage in place |
 Top cover with concrete access holes |
 Levelling the top edge to enable a nice flat pillar top |
 Formwork in place, side access covers and anchor bolts off |
 Side access covers and anchor bolts in place |
 Control room being picked up from Terroux Observatory |
 Control room being picked up from Terroux |
 Arriving at the top of the Tinderry Mountain road |
 Ready to unload at Eagleview Observatory |
 Unloading at a new much higher home |
 Lowering control room into place |
 Control room in place with its nice new view |
 Like an Eagle, purched up looking down across the Monaro |
 Security Guard - La La the Chicken! |
 Observatory Goodies |
 Formwork ready for concrete pour |
 Formwork ready for concrete pour |
 Slab formwork for 18 inch Dobsonian housing |
 Slab formwork progressing |
 Father and son team |
 Slab formwork for 18" Dob housing and observing area - finished |
 Plastic under slab and path-telescope isolation joint fabricated |
 Ready for an early morning delivery of concrete |
 Filling the column footing and agitating the concrete |
 Filling the telescope support column |
 Filling the slab for the 18" Dobsonian housing |
 Spreading, skreeting and floating, hard work |
 My life saving neighbour Allan |
 Kangaroo, wild pig, deer, wallaby and wombat deterrent fence |
 What a viewing spot this is going to be! |
 Concrete column and footing |
 After a final wet down concrete is finished |
 A bit of work but after a final wet down...Ta daaaaa! |
 Completed concrete support pillar |
 3M Scopedome leaving Sidereal Trading in Melbourne |
 3M Scopedome arriving at Eagleview 2nd April 2022 |
 Unloading1 |
 Unloading 2 |
 Unloading 3 |
 The Eagle has landed! |
 Highest astronomical observatory dome in Australia |
 Deck started 6 April 2022 |
 Deck aligned precisely true North-South |
 Deck stage 1 |
 Posts set deep down into rock |
 Posts set deep into the ground |
 Solar power system going in |
 Panels mounted at 32deg |
 Solar panels mounted |
 Solar panels mounted |
 Electrical setup |
 3.3 KVa pure sine wave inverter generator |
 3.3Kva inverter/generator |
 Deck almost completed |
 Stairs going in |
 Troy and Abbey of McPherson Homes |
 Gabby McPherson handy with the tools |
 Finished |
 Finished |
 A deck above the clouds |
 Whole observatory area is taking shape |
 Lovely Merbau deck |
 Deck supports at each corner |
 Under the deck |
 Isolated support pier |
 Concrete column isolated from deck |
 Even the view from under the deck is spectacular :-) |
 90% UV Shade cloth under deck |
 Electrical and data access will be via 90mm PVC pipe |
 Almost there... |
 Telescope and mount at previous Terroux Observatory |
 Removing around 50kg of mount for its new home in the mountains...bah! easy! |
 Removing the 45kg central steel pier... |
 A car full of quite a few thousand $'s worth of astro gear...drive carefully! |
 Full..and ready for the trip to their new home up in the Tinderry mountains |
 End of an era... |
 Gear all ready to be installed in the new dome |
Dome assembly 28 and 29 May 2022
|
 Ready for a clear night after the snow |
 Eagleview Observatory ready to rumble! |
 Mount, telescopes, imaging gear assembled and cables routed...ready to rumble |
 Power and data connected |
 Above ground piping for power and data cables |
 Pipes carrying power and data from the control room to the observatory |
 The dream is realised.... |
 Observatory in the snow |
 Observatory in the snow 2 |
 Assembling the shed for the 18" Goto Dobsonian |
 Assembling the shed for the 18" Goto Dobsonian |
 Assembling the shed for the 18" Goto Dobsonian |
 Assembling the shed for the 18" Goto Dobsonian |
 Assembling the shed for the 18" Goto Dobsonian |
 Assembling the shed for the 18" Goto Dobsonian |
 18 inch Dobsonian housing finished |
 Shed for the 18" Goto Dobsonian |
 Pristine air and sky, with visibility out to 83km! |
 Observatory with all infrastructure in place |
 Observatory with all infrastructure in place |
 Observatory with all infrastructure in place |
 Solar panels |