photo sharing and upload picture albums photo forums search pictures popular photos photography help login
strongmanmike2002 | all galleries >> Observatory and Equipment >> "Eagleview" - The Highest Observatory in Australia >> Building Eagleview Observatory (2022) > Power and data connected
previous | next
29-Aug-2022

Power and data connected

240V (Orange) and 12V (black) cabling, as well as two Cat6a data/ethernet cables (blue), now connect the control room to the observatory.


other sizes: small medium large original auto
comment | share