Not actually operating here but pretty amazing. A concrete mixer truck keeps the hopper (sticking out to the right)
topped off with concrete. An auger pulls the concrete across to a profiling form that shapes the entire curb cross-section
(rectangular tunnel-like piece on left). The curb around the whole inner circle was done in an amazingly short time.