photo sharing and upload picture albums photo forums search pictures popular photos photography help login
bchw | all galleries >> Lewis County Chapter >> Goat Creek Trail Project, 2006 > The Plan
previous | next
26-APR-2006 Jim Thode

The Plan

Green = trail centerline
Blue = Concrete footing pinned to sloping bedrock, use rock on exposed surface.
Red = Rock wall to level of concrete footing
Orange = Cedar log crib retaining wall, about three feet high to trail surface.

All fill in 6 to 10" lifts with geotech fabric on each lift.


other sizes: small medium original auto
comment | share
Marie Potter 01-Jul-2006 03:14
What an engineering feet and great job
Dave Beedon07-Jun-2006 19:02
This manner of showing the construction details is cool.