 Erin and S with 2.5m drill for deep holes.JPG |
 Erik at work site 1 West Lobe Bonney.JPG |
 Taylor Gl site 1 flags camp.JPG |
 Erin Peter drilling flag hole Erik.JPG |
 S chopping ice away from anchor master point.JPG |
 N-side cliff top S Erik Taylor Gl.JPG |
 Erik and S work at lip.JPG |
 Cliff site top with Rhone Gl.JPG |
 S and Erik working at the lip.JPG |
 Bombproof anchors to say the least.JPG |
 S getting ready to rappel.JPG |
 Erik about to rappel flags from last year.JPG |
 Erik removing loose ice hazards while on rappel.JPG |
 Erin and S setting up to install instruments .JPG |
 Taylor Gl N-side cliff Erin W and S.JPG |
 Taylor Gl N-side cliff Erin W drilling and S.JPG |
 Ice below our feet has recently fallen off.JPG |
 Erin W hand drilling while power drill being fixed.JPG |
 Hand drilling while power drill being fixed.JPG |
 Instruments-centimeter marks help measure ablation.JPG |
 Looking down on Erin W and instruments.JPG |
 Reflectors help for surveying from distance.JPG |
 N-side cliff base Erin W with screw level and power drill.JPG |
 Instruments being installed into cliff face- pipes wire tilt sensors more.JPG |
 N-side cliff base Erin with instrument pipe Erik.JPG |
 N-side cliff base Erin P.JPG |
 Shiny ice pre-calving and pre-melt season.JPG |
 Wall textures pre melt season rougher on L hasnt calved yet.JPG |
 Calving debris from shinier part of wall.JPG |
 Ice Debris from previous calving.JPG |
 ice chunks from glacier sitting on dry ground.JPG |
 Taylor Hughes Gls orange from Blood Falls pool West L.JPG |
 Top of site and face from air helo checking us out.JPG |
 The cliff site from the air.JPG |
 S and Thomas on top of site from air.JPG |
 Erik and Erin P on cliff face from the air 4.JPG |
 Upper Taylor Gl and peaks from air.JPG |
 Upper Taylor Gl work site 2 where a core will be taken.JPG |