My luck started out bad... |
...and quickly went to worse |
Cynthia and I chose an edge treatment for our granite |
Jim works on the floor mosaic in his hotel room |
The mosaic is almost done! |
Trial setting of rug mosaic |
Just need the last two panels |
I made this design just for Cynthia |
Getting close to finished! |
A local guest in the house |
Stucco is finished . . . |
Too bad they didn't fix it as requested |
Bilingual warnings |
Carlos adds some new tiles to the wall |
A nice cherry trim we'll be trying |
Finally added the vents to the kiva |
I wish Cynthia was with me at Bryce |
Adding tile to the utility room floors |
Beautiful tile work - even in closets! |
Prepping back yard for the patio |
Drainage pipes for the driveway |
Very quick work |
Bud supervises the job |
Very nice culvert instalation! |
Using Rastra for the retaining wall |
Where Rastra joins the slickrock |
No glue on the rock - great! |
Painting (rounds 3-6) |
Need to redo with good rocks |
Screening for propane and a/c units |
Ready for concrete forms |
Cement truck and pump for the patios |
'Italian Slate' stamping forms |
Stamping the wet concrete |
North patio looks great |
Steps to the outdoor shower |
Steps being formed |
Pouring the back patio |
Ready to remove the forms |
Beautiful transition to the slickrock |
The steps turned out beautifully |
Kivas are being formed |
Beautiful weather today |
The moon over our local mountain |
Starting the kitchen cabinets |
Kitchen cabinets - right side |
Kitchen cabinets - left side |
Master bathroom vanity |
Guest bathroom cabinet and raised vanity |
Guest bedroom desk and bookcase |
One of the two window seats (before adding the angled tops) |
Cynthia tests our new art against the new wall color |
Nice new art we bought from the DeZion Gallery |
This is how we moved the boulder back into the kitchen |
Sometimes things go wrong |
Test fitting the headboard sandstone |
The front door steps |
Front patio area |
Jim never cleans up after his activities! |