 Ol Ranger Brew Station Completed |
 How it started: Source Material: Old Gym weight equipment |
 ...get a workout digging through this pile! |
 Removing some un-neccessary metal |
 Dad's ole yeller pickup comes in handy |
 5 bench press arms will be used to make the frame |
 Looks pretty good |
 One set of legs |
 One end clamped together |
 More cutting... |
 All the press arms clamped together |
 ...the general idea. |
 It's a start...more to come. |
 Mash Return n Sparge manifold 1/2 inch copper |
 Mash Return n Sparge manifold2 |
 guts |
 Optional upright arms to support Mash tipping |
 Stand with manifold layout |
 Manifold positioning |
 top view of manifold1 |
 top view of manifold2 |
 Front view with pump/therminator hanger |
 Gas Manifold Assy |
 Frame with casters on |
 Frame Side |
 Got Steam |
 Burners from below |
 Heating up |
 More Steam |
 Motor Mounts |
 Another Test |
 Got Far |
 More Far |
 Cool Light |
 Serious Flame |
 therminator1 |
 Plate & Hubcap = Control Panel |
 Nice fit |
 Switches, Controlers, & Lights Mounted |
 Wired and Ready |
 Frame w pump n chiller mount clamped1 |
 Frame w pump n chiller mount clamped2 |
 Frame w pump n chiller mount clamped3 |
 Control Mount |
 Control placement |
 Pump & Chiller placement1 |
 Pump & Chiller placement2 |
 Frame & ol' Ranger |
 Frame |
 ol' Ranger |
 Mash / Lauter Tun2 |
 Sparge / Lauter Manifold & Lid1 |
 Sparge / Lauter Manifold & Lid2 |
 Inside showing false bottom w/ Bazooka below, thermo well and return inlet |
 Return (top), Thermowell (top right), and falsebottom |
 Hole plug just below valve (it wasn't quite centered) |
 Thermometer & valve |
 With manifold lower to the bottom |
 Gettin Close |
 Painted and wired |
 All hosed up |
 Chiller & Pumps. The Therminator Chiller is Truely Amazing! |
 Test Run |
 Backside |
 Tops |
 Mashing @ 154; Hot Liquor Tank @ 168 |
 All Systems Go |
 Good Smells- Brew #2 |
 Houston, We Have Fermentation |
 15 gallons of beer on the wall.... |