Christopher Schardt |
profile
|
all galleries
>>
Projects
>>
Catwalk Studios
>>
Construction
>> West Wall
tree view
| thumbnails |
slideshow
Concrete Sawing
|
Foundation
|
Shear Wall
|
Structural Work
|
1st Floor
|
1.5th Floor
|
2nd Floor
|
Roof Platform
|
The Crane
|
Foam Insulation
|
Solarium and Deck
|
Concrete Floors
|
West Wall
|
Main Ceiling
West Wall
the concrete west wall of the house
00.Original.jpg
00.Original.JPG
01.Shed Moved.JPG
Removing Door.JPG
08.Cutting Wall.JPG
First Cut.JPG
First Cut Inside.JPG
Second Cut.JPG
Vertical Cut Setup.JPG
Vertical Cut 1.JPG
Vertical Cut 2.JPG
Vertical Cut 3.JPG
Vertical Cut Inside.JPG
Vertical Cut Stopped.JPG
Vertical Cut Track.JPG
02.Walls Being Sawed.JPG
Preparing to Drop.JPG
03.Wall Sawed.JPG
04.Wall Dropped.JPG
Wall Dropped 1.JPG
Wall Dropped 2.JPG
Wall Dropped 3.JPG
Door Hole Ready to Drop.JPG
Door Hole Half Dropped.JPG
Well-Crushed Tire.JPG
Ready to Push.JPG
10.Two Holes Cut.JPG
Wall Jackhammering.JPG
05.Wall Jackhammered.JPG
Christian the Bobcat Man.JPG
Barely Fits In There.JPG
Piling.JPG
Scooping.JPG
Barely Getting Out.JPG
09.Cat Door.JPG
Cat Door.JPG
New Concrete Block 1.JPG
New Concrete Block 2.JPG
10.New Concrete Block.JPG
New Concrete Block 3.jpg
Filling Blocks with Concrete 1.JPG
Filling Blocks with Concrete 2.JPG
New Block Seamless with Old.JPG
12.Installing Steel Supports.JPG
Installing Steel Supports.JPG
Steel Support Installed.JPG
13.Steel Supports Installed.JPG
14.Door Installed.JPG
15.Window Installed.JPG
comment
|
share
Type your message and click Add Comment
It is best to
login
or
register
first but you may post as a guest.
Enter an optional name and contact email address.
Name
Name
Email
help
private comment
click on thumbnails for full image