Foundation

after the concrete was cut, it had to be jackhammered out. then we had to dig down up to 3' for the new foundation. then we had to build rebar cages. then we called for the concrete truck and pump.
Jackhammering Begins.JPG
Jackhammering Begins.JPG
Digging.jpg
Digging.jpg
Anika Wide-Eyed.JPG
Anika Wide-Eyed.JPG
Inside Rebar Cage from West.JPG
Inside Rebar Cage from West.JPG
Fireplace Foundation Rebar.JPG
Fireplace Foundation Rebar.JPG
Shear Wall - looking east.JPG
Shear Wall - looking east.JPG
Shear Wall - looking west.JPG
Shear Wall - looking west.JPG
Shear Wall West End.JPG
Shear Wall West End.JPG
Shear Wall East End.JPG
Shear Wall East End.JPG
Sewer Pipe Half-Buried.JPG
Sewer Pipe Half-Buried.JPG
Floor Drain.JPG
Floor Drain.JPG
Small Post Foundation 1.JPG
Small Post Foundation 1.JPG
Large Post Foundation 1.JPG
Large Post Foundation 1.JPG
Time Capsule Parts.JPG
Time Capsule Parts.JPG
Time Capsule Assembled.JPG
Time Capsule Assembled.JPG
Time Capsule Installing.JPG
Time Capsule Installing.JPG
Time Capsule Installed.JPG
Time Capsule Installed.JPG
Concrete Pump Hopper.JPG
Concrete Pump Hopper.JPG
Concrete Arriving.JPG
Concrete Arriving.JPG
Concrete Pumping.JPG
Concrete Pumping.JPG
Post Foundation Filled.JPG
Post Foundation Filled.JPG