 The building early August |
 The Junior suite kitchen area |
 tiling the showers |
 my shower and sink area |
 Benjamin the carpenter |
 The cabinet maker, he is an artist. |
 installing the sink in one of the Grand suites |
 My kitchen |
 beautiful hand made cabinets |
 repairing the street |
 almost finished |
 tiling the pool |
 Our Trump room |
 The Melrose door |
 blocking the pool tiles |
 Ralph looking at the work |
 View of the building on June 17 |
 Ralph standing in our door frame |
 windows ready to be installed |
 My kitchen ready for tile and cabinets |
 installing the windows |
 windows installed on second floor |
 tile going down |
 window ready to install in the bathroom |
 entry way |
 Jimmy painting the entry |
 preparing the floor for the tile |
 doors almost ready |
 building the room in the park for the water tanks |
 making a bench on the outside wall |
 our wooden doors soon to be varnished |
 outside paint color |
 bathroom tile |
 painting my kitchen and dining room |
 boxing in the downpouts |
 painting walk area |
 Our welder made me a table will inlay tile on the top |
 smoothing out the coping around the pool |
 primer is going on |
 concrete for the ceiling |
 doing the concrete throw |
 coping around the pool |
 the boys building the shower wall |
 Ralph studying the park repairs |
 bench and stairs in the pool |
 The worker really enjoying the view |
 One of the workers with his family enjoying the deck |
 The view from the deck in our condo |
 tile going up in the bathrooms |
 view of the pool on the second floor |
 Ralph is concerned about the depth of the pool |
 I think it will be ok for the water aerobics on Weds mornings |
 lots of tile |
 This is one of our delux rooms. We are thinking of buying a mattress. |
 preparing the grout |
 Owens Corning insulation R-19 |
 Sheetrockers are good! |
 hard at work |
 Our welder building a gate |
 lots of tile on the truck |
 preparing the pool for the tile |
 Sheetrockers doing the eaves |
 Nice Job! |
 pool from the second floor |
 Workers washed their clothes for their trip home for the week end |
 Our front door. Wood goes in between the rails |
 inside the courtyard |
 Our living room |
 Building on June 1, 2006 |
 Renda showing the painter a spot he missed |
 building the swimming pool |
 Putting down the base floor for the tile |
 cutting the trees in front of our deck |
 the roof going on |
 roof and concrete |
 using a buzz saw to cut concrete |
 building the pillars |
 iron in the pool area |
 the pool |
 preparing for the pour of the pool |
 one of the kitchen tops all concrete and tile |
 the welder doing his job,starting the roof |
 The upper deck beginning |
 building the deck |
 roof girders |
 pouring the forms for the upper deck |
 the metal doors for the under ground storage of tanks |
 the top story is almost finished |
 the welder on the roof |
 Ralph overlooking the work |
 cement |
 more cement |
 welding the girders |
 burying the rock |
 making the door inserts |
 perfect |
 filing to fit |
 hand made doors. |
 The wood working shop |
 one of the sinks |
 success! |
 working the rock in the hole |
 pushing the rock |
 digging a deep hole |
 can't move it, can't break it, bury it.... |
 making the iron |
 they uncover the BIG rock |
 so far so good |
 ready to tackle digging the pool |
 yes, it is a big blue rock, the hardest rock in the country |
 can't blast it, it is under the stairway |
 building the front wall |
 lots of iron everywhere |
 the roof is started |
 the stairway almost finished |
 Ralph on the stairway |
 Dan with Ralph |
 second story |
 stairway over the pool |
 guys working on the concrete room |
 preping the skimcoat for paint |
 upstairs before the roof begins |
 the roof finally on the underground room |
 putting the roof on the sub room |
 building the stairway |
 the way they run their lines |
 wooden door made on the premises |
 the cabinet shop on the premises |
 the stairway over the pool |
 the front of the building in February '06 |
 setting the iron for the stairway |
 stairway |
 Front of building in December |
 location of the sub room for gas tank and water tanks |
 The underground room...January '06 |
 guys working, who needs scafling |
 court yard looking up at second floor |
 room being built |
 woodworker |
 under ground room |
 mixing concrete in the street |
 Our friends in front of the building |
 cement for the wall and pillars |
 more cement |
 more cement, they carry it in buckets |
 January....court yard |
 what a window |
 Ignacio our building superviser |
 street side, second story going up |
 inside one unit looking over ocean |
 on the second story balcony |
 pillars for the deck |
 this is view from second story deck |
 digging the room for the water storage tanks |
 lower one bedroom unit |
 January courtyard |
 front view, men carrying cement bags |
 street view...December '05 |
 mixing concrete |
 pouring cement for the wall to support the deck |
 lots of iron |
 pouring cement from buckets |
 September at the villas |
 September 2005 view from street |
 September 2005 ceiling on first floor |
 September 2005 second floor view from window |
 August 2005 standing in the court yard |
 August 2005 plumbing on second floor |
 June 2005 inside courtyard window |
 first floor walls going up! |
 columns for the second floor deck |
 almost ready for the ceiling |
 small arches for first floor ceiling |
 side view going up the hill |
 worker standing in door way |
 June 2005 pouring cement |
 May 2005 First floor wall |
 May 2005 keeping the street clean |
 May 2005 neighbors wall fell. We built it back better! |
 April 18 worker placing frames and rebar |
 April 2005 checking the back wall |
 April 18 mixing cement to fill the building blocks |
 April 2005 laying out the walls |