Pier was installed and concrete allowed to cure for 3 days. Assembly of the walls, and wiring. The shed straddles two huge concrete floating slabs that supported large tobacco drying kilns. The space between is where the pier was installed without touching the either slab to prevent vibrations. You could hold a square dance without a trace of vibration at the eyepiece.