photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Steve Carter | profile | all galleries >> Railroad >> Tacoma Trestle Construction >> First Half Construction tree view | thumbnails | slideshow

First Half Construction

The replacement to the Historic Milwaukee S-Curve bridge is a double track concrete and steel structure. So as to continue rail operations during construction, the new bridge was built approximately in two halves. The first half was constructed to the south of the trestle and included a short section of double track width bridge, where it would fit in the curve of the trestle it was replacing.
previous pagepages 1 2 3 4 5 6 7 ALL next page
1-IMG_3015.jpg
1-IMG_3015.jpg
2-IMG_3016.jpg
2-IMG_3016.jpg
3-IMG_3030.jpg
3-IMG_3030.jpg
5-IMG_3040.jpg
5-IMG_3040.jpg
6-IMG_3046.jpg
6-IMG_3046.jpg
7-IMG_3055.jpg
7-IMG_3055.jpg
8-IMG_3095.jpg
8-IMG_3095.jpg
9-IMG_3102.jpg
9-IMG_3102.jpg
10-IMG_3656.jpg
10-IMG_3656.jpg
11-IMG_3662.jpg
11-IMG_3662.jpg
12-IMG_3702.jpg
12-IMG_3702.jpg
13-IMG_3764.jpg
13-IMG_3764.jpg
previous pagepages 1 2 3 4 5 6 7 ALL next page