Visually it's hard to see much progress today, but there was quite a bit of time put into the project. Most of the time was devoted to removing or relocating existing electric lines that ran through the studs. One of the second floor joists was attached to the west wall which gives an idea of the height.
The 4th will be a down day. A strong arctic cold front just blasted through and it will be very windy and cold. In fact, there are several fronts on the horizon that are likely to keep things cold through the middle of the month. Work will have to go on eventually as I have my electrician lined out for a period, two weeks from now.