May 2010 - Sprinklers in Place, Insulation

Sprinkler heads have been attached and the fire suppression system has been pressure tested. Insulation is nearly complete, so drywall can start soon. By May 10th, drywall has been installed and we're waiting for inspection so we can install a second layer of 5/8" drywall on the first floor ceiling for added fire protection. By May 15th, the extra layer is added and taping is done.
previous pagepages 1 2 ALL next page
Sprinkler Heads are in place & tested
Sprinkler Heads are in place & tested
Insulation with R13 and R30 EcoBatt
Insulation with R13 and R30 EcoBatt
R-13 for walls
R-13 for walls
and R-30 for the roof
and R-30 for the roof
More R-30 on site, but not ecology friendly
More R-30 on site, but not ecology friendly
R-30 in the dormer ceiling
R-30 in the dormer ceiling
In the kitchen, R-30 floor, R-13 walls
In the kitchen, R-30 floor, R-13 walls
R-30 EcoBatt is also useful as aTable
R-30 EcoBatt is also useful as aTable
In other work, the railing is braced
In other work, the railing is braced
Construction Fences are Down
Construction Fences are Down
Apartment Entrance
Apartment Entrance
Apartment Steps
Apartment Steps
Apartment Closets
Apartment Closets
Apartment Kitchen
Apartment Kitchen
Apartment Dormer
Apartment Dormer
Apartment Bathroom Sink
Apartment Bathroom Sink