06-FEB-2018
The site when I started.
The goal was to build a set of steps that would go from the ground level to the height of the wall that's coming in from the left. On the right would be two terraces, one short for planting, and another larger one that would have a gathering area w/ table and chairs.
07-FEB-2018
The first thing was to get as much fill dirt dumped inside what would be a rather large terrace. It was either do it now are move it in w/ a wheelbarrow later.
Then I dropped in the bottom landing using the hoist on my truck. Now I could calculate how many steps it would take to get to the next landing.
I also laid down a few markers to determine how much of that dirt pile we needed to move.
08-FEB-2018
The wall base and first couple steps in place.
We also started closing in the end of the first terrace (seen on the right).
09-FEB-2018
Being that this place was a short-term rental, we only had these 4 days to get something started. After that it was booked for the next two weeks.
This was the point that we were going to leave it at for now.
26-FEB-2018
After two weeks and getting back into the "vision" of what I'm working on.
I don't really like long breaks in the "creative flow", . . . takes a while to get back up to speed.