The London Tideway Tunnel Sewer

The new sewer was finished in 2024 and is now working The new Super Sewer is 25km long and 65m deep. It has cost £5 billion pounds to build
The new Sewer is finished, this area is the cover over the top
The new Sewer is finished, this area is the cover over the top
Crane to lift spoil out of the tunnel
Crane to lift spoil out of the tunnel
Spoil barge
Spoil barge
All the soil dug out of the tunnel goes in this barge
All the soil dug out of the tunnel goes in this barge
Temporary offices above tunnel
Temporary offices above tunnel