The London Tideway Tunnel Sewer

The new sewer was finished in 2024 and is now working The new Super Sewer is 25km long and 65m deep. It has cost £5 billion pounds to build
The workmen on the new sewer planted some Tomatoes, they got a good supply of them.
The workmen on the new sewer planted some Tomatoes, they got a good supply of them.
Lots of supplies for the workers.
Lots of supplies for the workers.
A lot of Ironwork for the workmen.
A lot of Ironwork for the workmen.
Concrete supports for jib of crane.
Concrete supports for jib of crane.
Railings.
Railings.
Drilling work to check the ground before they built the new sewer.
Drilling work to check the ground before they built the new sewer.
The new Sewer is finished, this area is the cover over the top
The new Sewer is finished, this area is the cover over the top
The crane lifts the spoil out of the tunnel into the barge.
The crane lifts the spoil out of the tunnel into the barge.
Crane to lift spoil out of the tunnel
Crane to lift spoil out of the tunnel
Spoil barge
Spoil barge
All the soil dug out of the tunnel goes in this barge
All the soil dug out of the tunnel goes in this barge
Temporary offices above tunnel
Temporary offices above tunnel