photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Jennifer Harvey | profile | all galleries >> Red Door Ample Camp >> River House Build tree view | thumbnails | slideshow

River House Build

Taken around May 1, 2025
(scaffold put on side porch April 30, and trees showed leaves May 8
River House Plans
:: River House Plans ::
River House Design Ideas
:: River House Design Ideas ::
River House Recent Photos
:: River House Recent Photos ::
Spring 2025 satellite house 1000h.jpg
Abbreviated House Chronology
:: Abbreviated House Chronology ::
June 11 - 13
:: June 11 - 13 ::
Excavation and Site Work
:: Excavation and Site Work ::
Foundation and Digging for Utilities
:: Foundation and Digging for Utilities ::
Building the Envelope
:: Building the Envelope ::
Utilities: Electrical , Gas, Water, and Plumbing
:: Utilities: Electrical , Gas, Water, and Plumbing ::
Floors, Ceilings, Stairs, and Insulation
:: Floors, Ceilings, Stairs, and Insulation ::
Interior Siding and Sheetrock
:: Interior Siding and Sheetrock ::
Kitchen and Bathrooms
:: Kitchen and Bathrooms ::
Lighting, Trim, Railings etc.
:: Lighting, Trim, Railings etc. ::
 'The Cellar' and Stairs
::  'The Cellar' and Stairs ::
River House Gardens - Landscaping
:: River House Gardens - Landscaping ::
Time Lapse
:: Time Lapse ::
Contractors
:: Contractors ::
Materials
:: Materials ::
River House Sun Path
:: River House Sun Path ::