After the loconet had been installed to the front of the modeled town of Greeley, the UR92 could be repositioned to a higher and more layout central position. The UR92 requires supplemental electrical power and as a consequence, it was necessary to tap into a 120 v electrical line and install an electrical box in the ceiling (not visible in this photo). The relocated panel will be placed into a fabricated box and attached to the top of the stud wall. The loconet cable was then run under the layout and up one of the studs of the peninsula wall.