photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Steve Orel | all galleries >> Galleries >> 1972 "Jeepster" Commando project > Main frames both complete
previous | next
05-JUL-2013

Main frames both complete

Both main pieces are bent and in place. I have a little fine tuning to do to make sure that the height is the same on both sides and that both pieces are straight and vertical.

One problem that I need to fix is that I need to be able to remove the cage so that I can paint the tub and also paint the cage since they will be painted different colors. The mounting on the C pillar is tight in the back corners close to the back side of the tail lights and because the angle of that section of the body angles inward it will make it virtually impossible to remove the cage.

Some re-engineering of the back tubes will need to be done to fix this issue!

Canon EOS 5D Mark II
1/1000s f/2.8 at 27.0mm iso400 full exif

other sizes: small medium large original auto
share
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment