photo sharing and upload picture albums photo forums search pictures popular photos photography help login
elstan | all galleries >> Galleries >> Long Beach >
previous | next
25-Oct-2019

The the Gerald Desmond replacement bridge. When completed, the new bridge will span the Port of Long Beach’s Back Channel with a deck rising 205 feet above the water. The cable-stayed bridge will include additional traffic lanes, a higher clearance to accommodate larger cargo ships, and a dedicated bicycle path and pedestrian walkway, including scenic overlooks. With two towers reaching 515 feet into the sky, it will be the second-tallest cable-stayed bridge in the United States.

Nikon D200
1/320s f/8.0 at 300.0mm iso100 full exif

other sizes: small medium large original auto
share
joseantonio26-Oct-2019 03:38
looks really impressive.Very nice capture from that point.V.
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment