Chris & Kim | all galleries >> Home Improvement >> Kitchen Remodeling > More delays.
previous | next
1731 2/27/04 CBR

More delays.

The first contractor wanted to lay two sheets of slightly different color linoleum, so we
had our doubts about him anyway. The new floor arrived today, but when the second contractor
showed up to install it, he said he couldn't lay linoleum on a floor that was so unlevel. In
addition, it was going to cost as much to level the floor as it was going to install the linoleum.
Fun fun, back to Lowes we go. About now we're getting upset. What should have taken 1 day, has
turned into 2 weeks. The second crew of installers is top notch tho, and we've told Lowes not to
send that first group back. And, as a testament to Lowe's committment to customer satisfaction,
they're footing the bill for leveling what the first contractor was trying to "get by with".

Canon EOS 300D Digital Rebel
1/20s f/3.5 at 21.0mm iso400 with Flash hide exif
Full EXIF Info
Date/Time01-Jan-1980 00:01:28
MakeCanon
ModelCanon EOS DIGITAL REBEL
Flash UsedYes
Focal Length21 mm
Exposure Time1/20 sec
Aperturef/3.5
ISO Equivalent400
Exposure Bias
White Balance (-1)
Metering Modematrix (5)
JPEG Quality (6)
Exposure Program
Focus Distance

other sizes: small medium original auto
comment | share