photo sharing and upload picture albums photo forums search pictures popular photos photography help login
David Hobbs | all galleries >> Sydney Tours >> Sydney Coast 2 > OH203.jpg
previous | next
10-SEP-2009

OH203.jpg

This metal grid surface is the section of the bridge which actually swings up to allow the passage
of harbour traffic. It happens eight times a day, beginning at about 10:00 am in the morning and
ending at 9:30 at night. On weekends the first opening is at 8:30 am. A higher, wider bridge which
can carry vehicular traffic AND continuously allow the passage of marine traffic is sorely needed.

Nikon D40
1/250s f/7.1 at 18.0mm iso200 full exif

other sizes: small medium original auto