![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
This metal grid surface is the section of the bridge which actually swings up to allow the passage
of harbour traffic. It happens eight times a day, beginning at about 10:00 am in the morning and
ending at 9:30 at night. On weekends the first opening is at 8:30 am. A higher, wider bridge which
can carry vehicular traffic AND continuously allow the passage of marine traffic is sorely needed.
Full EXIF Info | |
Date/Time | 10-Sep-2009 09:10:00 |
Make | Nikon |
Model | NIKON D40 |
Flash Used | No |
Focal Length | 18 mm |
Exposure Time | 1/250 sec |
Aperture | f/7.1 |
ISO Equivalent | 200 |
Exposure Bias | -0.33 |
White Balance | |
Metering Mode | matrix (5) |
JPEG Quality | |
Exposure Program | program (2) |
Focus Distance |
Images are subject to copyright. They may not be used without permission.