 New Paint Job, Fall 2009 |
 Layout of the Willow (ours) |
 Facing north Aug 10 |
 Aug 31 Set up for footings |
 The first floor and insulation Nov 3 |
 The deck of the first floor looking North |
 Facing south on new Paget St. Nov 25 |
 Lots going on Saturday Nov 25 2006 |
 A sunroom facing west Dec 24, 2006 |
 Down to under ground parking Dec 24 |
 Garage opening facing north Jan 17 07 |
 Long Shot west wall Mar 28 2007 |
 South East corner Mar 28 |
 West wall taking shape Mar 28 |
 The down ramp April 8 2007 |
 Stairwell_boardroom_ etc. Inside view |
 Front wall second floor April 28 07 |
 South West Wall second floor April 28 |
 West side hard at work April 28 |
 Sides on sun room May 3 |
 Back view May 20 |
 Left front South May 20 |
 East side of building May 20 |
 3rd Floor started June 1, 2007 |
 The floor on the 3rd floor is in June 1 |
 Our Sunroom third floor June 24 |
 Some windows are in June 24 front |
 Third floor takes shape June 24 |
 Front of building July 7 07 |
 HVAC System installed |
 Furnace_AC_Sprinkler system |
 Part of the Ducts for furnace |
 July 29 2007 4th foor sun rooms started |
 July 29 2007 Third floor completed north |
 Car park from the new road Aug 18 07 |
 East wall Aug 18 07 |
 Note new sidewalk on Paget St. Aug 18 07 |
 4th. floor completed West side Aug 18 07 |
 5th. floor started Aug 18 07 |
 North side of building 08/26/07 |
 North side 08/26/07 |
 West side of building Aug 26 07 |
 South side garage entrance Aug 26 07 |
 South side of building wide shot Aug 26 07 |
 Getting ready for pouring cement Aug 26 |
 Front side of building Aug 26 07 |
 Front entrance |
 Shot of down ramp |
 Front of building 09/15/07 |
 North East 5th floor 09/15/07 |
 North Side 09/15/07 |
 South West corrner 09/15/07 |
 South West doors back of building 09/15/07 |
 South side 5th floor 09/15/07 |
 South west side 09/15/07 |
 Back side of building 09/15/07 |
 South west side 10/05/07 |
 South west side of building 6th floor started 10/05/07 |
 South side 10/05/07 |
 Parking lot being fixed up 10/05/07 |
 New curbs to under ground parking 10/05/07 |
 Crane moved to the west side of building |
 Back of building 10/05/07 5th floor |
 Back side 10-13-07 |
 North west Corner showing the roof 10_13_07 |
 By the driveway down 10-13-07 |
 Raising the roof Oct 25 2007 |
 Front Paved Oct 28 07 |
 Front parking Oct 28 07 |
 Road going in to buildings Oct 28 paved |
 Working on the finishing |
 Parking lot view 11-04-07 |
 Front entrance 11-04-07 |
 Finishing touches on roof edge |
 South west side 11-11-07 |
 South side 11-11-07 |
 Front of building 11-11-07 |
 Wide angle shot of the north west side |
 Nov 21 07 Progress on the front door area |
 Front east side 11-25-07 |
 Front with glass in 11-25-07 |
 South East side 11-25-07 |
 Pillars in front, Entrance in the background |
 Master Bath W_M |
 Inside main entrance looking through the front door glass |
 Kitchen entrance W&M |
 Kitchen area |
 Microwave installed |
 Over Fridge Wayne and Morna |
 Kitchen looking in from dining room W&M |
 Entrance and eating area with Pantry door |
 Pantry |
 Master bedroom (bathroom) |
 Master bedroom primed |
 Hallway nice colours |
 Kitchen and hard wood, needs finishing. |
 Some different angles |
 facing down the hall to bedroom |
 Bathroom floor |
 Towards kitchen |
 Pantry shelves |