Pouring a foot of concrete per hour, the structure of the new CWB elevator at Bloom was completed in 8 days.
ALL PHOTOS COPYRIGHT MATT TOLTON, NOT TO BE COPIED OR REPRODUCED WITH OUT PERMISSION!!