photo sharing and upload picture albums photo forums search pictures popular photos photography help login
timlewis | profile | all galleries >> London WRG >> Wey & Arun Canal 9th & 10th September 2006 tree view | thumbnails | slideshow

Wey & Arun Canal 9th & 10th September 2006

previous pagepages 1 2 3 4 ALL next page
It's all too much for Ed!
It's all too much for Ed!
View of the chamber with scaffold being re-erected
View of the chamber with scaffold being re-erected
Cleaning up the lock
Cleaning up the lock
Erecting shttering for next section of coping 'stone'
Erecting shttering for next section of coping 'stone'
Maria prepares the rear shutter
Maria prepares the rear shutter
A clean chamber!
A clean chamber!
Phil prepares for the next lift of facing blocks
Phil prepares for the next lift of facing blocks
A view of the chamber with the scaffolding re-erected
A view of the chamber with the scaffolding re-erected
A laid back Nigel levels the site
A laid back Nigel levels the site
The re-erected scaffold by the upper lock gates
The re-erected scaffold by the upper lock gates
Graham cleans up
Graham cleans up
Looking up the new lowered channel towards the Onslow Arms
Looking up the new lowered channel towards the Onslow Arms
previous pagepages 1 2 3 4 ALL next page