Three Mills Lock Opening 5th June 2009

Official opening of the new Three Mills Lock on the Prescott Channel 5th June 2009. Th elock is planned for passing construction material to the 2012 Olympic site in East London
previous pagepages 1 2 3 4 ALL next page
9.30am and we are waiting for the tide
9.30am and we are waiting for the tide
Boats start to arrive
Boats start to arrive
Waiting above Bow Lock
Waiting above Bow Lock
Nearby, stones were being unloaded from a barge
Nearby, stones were being unloaded from a barge
These stones were retrieved from the Prescott Channel ...
These stones were retrieved from the Prescott Channel ...
... they are the remains of the Euston Arch demolished in the 1960's
... they are the remains of the Euston Arch demolished in the 1960's
We follow a barge up the Channelsea Creek
We follow a barge up the Channelsea Creek
Two of the original Three Mills
Two of the original Three Mills
Looking back at the railway bridge
Looking back at the railway bridge
First view of the new lock
First view of the new lock
Moored up on the lay-by
Moored up on the lay-by
The adjustable wier adjacent to the lock
The adjustable wier adjacent to the lock