Big roofing day. Shingles all done. Had to replace some roof boards - opted not to cover the whole roof with sheathing. New facia also. Instead of 5V Galvalume or soldered metal roof on the front porch, roofer offered to install copper which can be fabbed on-site and would be better for preventing leaks than the 5V since the slope is minimal.