Never done slab form-work before, so hey, thought I'd start with a circular
slab juuust to test our skills. It's a 2.6m diameter circle for a 2.3m Sirius
Observatory so there will only be a 6" strip of concrete around the base of the
building to minimise the amount of thermal mass exposed to the sun.
Edit: will be adding plastic to the bottom of the slab