photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Sharon E Evans | all galleries >> Galleries >> My Second day of riding the D&SNG from Durango to Silverton and back > 45 The engine blows down as we round the rock ledge at the Retaining Wall
previous | next
07-Jul-2012

45 The engine blows down as we round the rock ledge at the Retaining Wall

High Line

As the engine gets around the curve at the Retaining Wall the fireman blows down the boiler to get rid of impurities that build up on the bottom from the river water they use to make steam.


other sizes: small medium large original auto
previous | next
share
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment