03-NOV-2008
  100_4608.JPG
    30" gas pipeline being installed in the Hancock, NY area. Taken 11/3/08
 
 
  03-NOV-2008
  100_4607.JPG
    30" gas pipeline being installed in the Hancock, NY area.  11/3/08
 
 
  03-NOV-2008
  100_4606.JPG
    30" gas pipeline being installed in the Hancock, NY area.  Welders connecting two sections of the pipe together.  11/3/08
 
 
  03-NOV-2008
  100_4605.JPG
    30" gas pipeline being installed in the Hancock, NY area.  Welders connecting two sections of the pipe together.  11/3/08
 
 
  03-NOV-2008
  100_4604.JPG
    30" gas pipeline being installed in the Hancock, NY area.  11/3/08
 
 
  03-NOV-2008
  100_4603.JPG
    30" gas pipeline being installed in the Hancock, NY area.  Earth moving equipment preparing to backfill the trench.  11/3/08
 
 
  01-JUL-2008
  100_4384.JPG
    30" gas pipe waiting to be layed in the trench.  Taken from the Kirkwood meter and regulator station, looking east.  Taken 7/1/08
 
 
  01-OCT-2008
  100_4559.JPG
    30" gas pipe waiting to be layed in the trench.  Taken near the Hancock meter and regulator station, looking east.  Taken 10/1/08
 
 
  01-OCT-2008
  100_4560.JPG
    30" gas pipe waiting to be layed in the trench.  Taken near the Hancock meter and regulator station, looking east.  Taken 10/1/08
 
 
  01-OCT-2008
  100_4563.JPG
    30" Gas pipe waiting to be moved into place.  Taken near the Hancock meter and regualtor station.  Taken 10/1/08.