|  Rover Tennis Courts (3754)
 |  Rover - Cracks on South Side (3755)
 |  Rover - View from NW Corner (3756)
 |  Rover - East Court from N Side (3758)
 | 
|  Rover - Cracks in Surface (3763)
 |  Rover - South Side of East Court (3764)
 |  Rover - East Court Looking North (3765)
 |  Rover - Crack scraped and bonded (2550)
 | 
|  Rover - Cracks scraped and Bonded (2552)
 |  Spreading the Base Layer (2594)
 |  Spreading the Base Layer (2596)
 |  Pouring Acrylic Base (2604)
 | 
|  Second Court Half Covered (2606)
 |  Mixing the Green Surface Material (2648)
 |  Base and Green Layer Done (2649)
 |  Chalking the Doubles Sideline (2651)
 | 
|  Chalking the Doubles Sideline (2652)
 |  Finishing the First Red Coat (2654)
 |  Pouring the Second Red Coat (2660)
 |  Applicants must be in good physical condition (2661)
 | 
|  Spreading the Second Red Coat (2662)
 |  Loading Wheelbarrow with Red Coat (2666)
 |  From Wheelbarrow to Squeegee (2668)
 |  Resurfacing Courts is Fun Work (2669)
 | 
|  Spreading the Second Red Coat (2670)
 |  Finishing the Second Red Coat (2674)
 |  Finished with Red Coats (2680)
 |  Tool for Laying the Masking Tape (2883)
 | 
|  Lines Masked and Painted (2882)
 |  Painting the Baseline (2881)
 |  East Court Finished, Looking NE (2884)
 |  East Court Finished, Looking NW (2885)
 | 
|  West Court Finished, Looking SE (2886)
 |