This week the cab was nearing completion in paint while the pump house structure was staged awaiting arrival of the pump. Body fabrication was completed and began the paint process in metal finishing while the chassis began assembly. Next week the cab should begin on the cab line where cab related content is added and may be merged with the chassis. The pump house should have pump and plumbing installed while the body should be near completion in paint.