 Workers in the tunnel |
 Intersection |
 Some usefull and heavy machines |
 This will be a place for fresh air from above the mountains.....it will require a very long hole down. |
 Fresh concret |
 In front of us we can see the TBM (TunnelBohrMaschine, the drilling machine which is doing the hard work) |
 Below the TBM / Drilling machine |
 How the machine will be stableized to create the force to drill. Each side is pressing this feet at the wall. |
 Some net is used which will be covered by concrete. |
 Part of the TBM (Drilling machine) |
 Part of the TBM (Drilling machine) |
 Part of the TBM (Drilling machine), it is a very very large machine. |
 Inside the TBM is a nice working place. |
 On top of the TBM (drilling machine). |
 On top of the TBM (drilling machine). |
 Drilling heads. |
 The tunnel roof. |
 The tunnel. |
 Very low light condition. |
 The tunnel. |
ERROR: 500
NOTES: [hset] LOADING Redis is loading the dataset in memory, at /usr/local/share/perl5/Redis.pm line 268. ,
PBASE_ENV: production
Try Again:Go Home