 View towards far short wall. Lumberton on the left. |
 Opoosite view looking towards bathroom and stair landing. Bridge has been installed on the right. |
 View with Lumberton on the right showing the approach |
 View of Fishers (Interchange Yard) on the right and Benderville on the left. |
 Opposite view from other end of above. |
 Viw along main aisle on upper deck. |
 View showing piece from old layout, spliced into existing roadbed. |
 View of first interior peninsula on upper deck shwoing benchwork in place for both areas. Ravine (L) and Dakota Flats (R). |
 View from other side of rock cut. |
 LG236216.JPG |
 View looking towards end of the platform. Martinsburg on the left. |
 View down main upper aisle. Homasote for Poser on the lower left. |
 The big curves from the third inner peninsula around to Martinsburg. |
 Benchwork for Centerville on the right. |
 View of the third inner upper peninsula. benchwork for Parchment is in place. |
 Steel Bridge being mocked in for the valley outside of parchment. |
 Slightly different angle view of the above. |
 Overall view from interior of the third inner peninsula on the upper deck. |
 View towards stairs down to main level, with Martinsburg on the left. |
 View down main aisle from top of steps. |
 View of the third lower inner peninsula with trackwork being roughed in for Anthracite Narrows. |
 View of the upper deck "Big Curve" and the benchwork for the grade from the lower to middle decks. |
 View of the lower deck at TV Town to the steps and dispatchers booth. |
 Another view of the "Big Curve". |
 A direct view of the bathroom from the main level. |
 View from the landing showing all three levels at the bathroom. Note fascia is now on everything. |
 Overall view of the grade betwen the lower and middle levels and upper deck. |
 Overall view of the grade betwen the lower and middle levels and upper deck to the "Big Curve" |
 View showing track laid on splines for the middle to upper level transitions. |
 View from landing of lower deck. |
 Looking at the lower level showing the start of the helix from the hidden staging yard to Glenville Yard. |
 Middle and upper deck from the landing. |
 Homasote now in place for Glenville Yard, covering the staging yard below it. |
 View of second inner peninsula on the lower deck. Tylerton on the left, Quarryville on the right. |
 Overall view of main aisle for lower deck. |
 View showign control panel for hidden staging yard. |
 view from inside the lower second peninsula. |
 Overall view of Glenville Yard. |
 View of first interior peninsula. Arrival/Departure tracks for Glenville Yard on the right, Bovine on the left. |
 View from the end of the first interior lower peninsula. |
 The steps up to the main living area, with masonite applied to give the appearanc eof board and batten siding. |
 Another overall view of the steps. |
 Overhead view of the basement from standing on a bucket in the first interior peninsula of the upper deck. |
 View towards steps from same location as above. |