photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Pete Pantsari | profile | all galleries >> Panama Canal Cruise '18 >> Panama Canal Transit tree view | thumbnails | slideshow

Panama Canal Transit

Waiting their turn for the Canal in early morning
Waiting their turn for the Canal in early morning
I counted nearly 40 ships waiting to enter the Canal
I counted nearly 40 ships waiting to enter the Canal
The new Atlantic Bridge (under construction for 7 years)
The new Atlantic Bridge (under construction for 7 years)
New (wider) locks on the left, old ones on the right
New (wider) locks on the left, old ones on the right
Passing under new Atlantic Bridge
Passing under new Atlantic Bridge
Passing under new Atlantic Bridge
Passing under new Atlantic Bridge
Lining up to enter Gatun Locks
Lining up to enter Gatun Locks
Large auto carier exiting Gatun Locks
Large auto carier exiting Gatun Locks
A large Gator crossing the bow of our ship as we enter the lock
A large Gator crossing the bow of our ship as we enter the lock
A Mule working in the heavy rain
A "Mule" working in the heavy rain
Mules keeping a large ship in the center of the lock
Mules keeping a large ship in the center of the lock
Note the elevation change from one lock to the next.
Note the elevation change from one lock to the next.
Gates closed and filling with water.  Note the roadway on left.
Gates closed and filling with water. Note the roadway on left.
Mules at work under the Gatun Lighthouse
Mules at work under the Gatun Lighthouse
In the lock about to be elevated
In the lock about to be elevated
The massive gates to the Gatun Locks on the Atlantic side.
The massive gates to the Gatun Locks on the Atlantic side.
At the Gatun Lake side of the locks
At the Gatun Lake side of the locks
Approaching Colon on the Atlantic side of the Canal
Approaching Colon on the Atlantic side of the Canal