photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Nonsuch Photo Galleries | profile | all galleries >> 30C Gallery >> JUNO 30C 12 1979 tree view | thumbnails | slideshow

JUNO 30C 12 1979

.

Karol Ike & Elena Kenney
JUNO 30C 12
Richebucto Cape NB . priv mooring
Atlantic Canada Fleet


* * *

Arthur wrote in spring 2007:

JUNO 30C 12 currently hails from Toronto, Ontario. Hopefully sometime in 2009 JUNO will hail from Richebucto Cape, New Brunswick.

Many pictures are of JUNO before we started the re-fit. This is what she looked like after over 20 years of, to quote my friend Bruce Bussin, "Dad only taking her out several times every week during the summer" but never significantly maintained or repaired by Bruce's wonderful Dad. He was 93 when he stopped sailing this boat. Both Bruce and his Dad, John, were past Commodores of Island YC.

JUNO is undergoing an extensive interior and exterior re-fit.


Arthur Langley
Karol Ike & Elena Kenney
JUNO 30C 12
Toronto ON . Royal Canadian YC
RCYC Flotilla (14 boats)
Greater Toronto Squadron (75 boats)
West-Lake Ontario Fleet (117 boats)

.

John Bussin (dec'd December '05)
JUNO 30C 12
Toronto ON . Island YC
West-Lake Ontario

.
Arthur with Karol & Elena as guests
Arthur with Karol & Elena as guests
JUNO 30C on Sunday
JUNO 30C on Sunday
Michael's view from masthead
Michael's view from masthead
Michael, Arthur & Jon
Michael, Arthur & Jon
Arthur's flowers in honour of Allen & Judy Ames
Arthur's flowers in honour of Allen & Judy Ames
His Amesness off Southwest light, Block Island
His "Amesness" off Southwest light, Block Island
between races
between races
JUNO 30C 12 & ELEPHANT 30 KC 2 /1
JUNO 30C 12 & ELEPHANT 30 KC 2 /1
coach roof pre re-fit
coach roof pre re-fit
strbd coach roof pre re-fit
strbd coach roof pre re-fit
cockpit & coach pre re-fit
cockpit & coach pre re-fit
old windlass gone pre re-fit
old windlass gone pre re-fit
port quarter deck pre re-fit
port quarter deck pre re-fit
boom bumpers pre re-fit
boom bumpers pre re-fit
boom rigging pre re-fit
boom rigging pre re-fit
mast at deck pre re-fit
mast at deck pre re-fit
partners pre re-fit
partners pre re-fit
boom end, port side, pre re-fit
boom end, port side, pre re-fit
strbd boom end pre re-fit
strbd boom end pre re-fit
topping life pre re-fit
topping life pre re-fit
cracked strbd boom end weld pre re-fit
cracked strbd boom end weld pre re-fit
galley during re-fit
galley during re-fit
galley work
galley work
cockpit
cockpit
all removed aft
all removed aft
strbd coach roof outer skin removed from over wet core damage
strbd coach roof outer skin removed from over wet core damage
strbd coach roof during re-fit, wet core damage
strbd coach roof during re-fit, wet core damage
strbd coach roof repair
strbd coach roof repair
port coach roof repair
port coach roof repair
gate stanchion base, core damage, port deck
gate stanchion base, core damage, port deck
gate stanchion base, repair, port deck
gate stanchion base, repair, port deck
instrument holes filled
instrument holes filled
sanding
sanding
bottom post blasting
bottom post blasting
Karol Ike & Elena Kenney
Karol Ike & Elena Kenney