Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> Cynwyd Station - Closing the outside, Oct. 2009 tree view | thumbnails | slideshow

Cynwyd Station - Closing the outside, Oct. 2009

Second floor windows, the roof, exterior painting
Installing windows in the dormer
Installing windows in the dormer
Dormer windows are done, some paint is scraped
Dormer windows are done, some paint is scraped
new windows on the bridge side
new windows on the bridge side
the driveway side
the driveway side
The window facing the tracks isn't done, but the whole roof is ready for tile.
The window facing the tracks isn't done, but the whole roof is ready for tile.
By the weekend, the last windows are installed
By the weekend, the last windows are installed
. . .  and the driveway end is primed
. . . and the driveway end is primed
Fire Suppression connectors
"Fire Suppression" connectors
Pipes cut to size before they arrived
Pipes cut to size before they arrived
Priming continues
Priming continues