Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> May 2009 - New contractor is on the job tree view | thumbnails | slideshow

May 2009 - New contractor is on the job

Ned Stumpo, our new contractor, has built stairs, moved partitions, and prepared to move the roof canopy.
Our new contractor: Stumpo Construction
Our new contractor: Stumpo Construction
The  canopy roof outside the building has moved
The canopy roof outside the building has moved
Before pulling and raising it back in place, it's separated from the roof going down to the track
Before pulling and raising it back in place, it's separated from the roof going down to the track
A view of the separation from below.  The canopy roof on the left will be moved
A view of the separation from below. The canopy roof on the left will be moved
The post and jack will raise the canopy roof.
The post and jack will raise the canopy roof.
Special feet for the post and jack
Special feet for the post and jack
Cables under the canopy roof will pull it back.
Cables under the canopy roof will pull it back.
See how the canopy has separated from the beam
See how the canopy has separated from the beam
Two cables are anchored to the chimney
Two cables are anchored to the chimney
Three other cables are anchored to the beams under the second floor.  We will tighten the cables and raise the posts in June.
Three other cables are anchored to the beams under the second floor. We will tighten the cables and raise the posts in June.
Other Work: Stairs are built
Other Work: Stairs are built
Other Work: Plumbing is in and protected by plates
Other Work: Plumbing is in and protected by plates
Tops or bottoms for the temporary posts?
Tops or bottoms for the temporary posts?
Max and Jerry inspect the paint
Max and Jerry inspect the paint
Future storm sewer connection
Future storm sewer connection