photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> June 2009 - Cynwyd Station revitalization tree view | thumbnails | slideshow

June 2009 - Cynwyd Station revitalization

The Canopy Roof is lifted and viewed. Rafters are replaced and braced. Work starts on windows and doors.
previous pagepages 1 2 ALL next page
Two weeks later, steel braces the wall.
Two weeks later, steel braces the wall.
Steel stabilizes the floor joists too.
Steel stabilizes the floor joists too.
First floor windows are being restored
First floor windows are being restored
New door to the waiting room is installed in the restored old frame.
New door to the waiting room is installed in the restored old frame.
previous pagepages 1 2 ALL next page