Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> Cynwyd Station, June 2010 tree view | thumbnails | slideshow

Cynwyd Station, June 2010

Proceeding slowly as we wait for the sanitary sewer. Beside the other work shown in the photos, granite tile has been added to the apartment by the end of June
June 4th: Second Floor Trim work
June 4th: Second Floor Trim work
second floor, Cynwyd Trail side
second floor, Cynwyd Trail side
Clothes closet
Clothes closet
g1/46/38946/3/125632170.uUXH0u4s.jpg
View, framed by masking tape
View, framed by masking tape
Staircse from the second floor
Staircse from the second floor
Downstairs, the door to the track is open
Downstairs, the door to the track is open
June 23d: Stairs to second floor
June 23d: Stairs to second floor
PermaBase 1/2 in. cement board subfloor
PermaBase 1/2 in. cement board subfloor
PermaBase label
PermaBase label
cement board in bathroom
cement board in bathroom
Railing in place, constructing newel post
Railing in place, constructing newel post
kitchen cabinets and floor are installed
kitchen cabinets and floor are installed
stairs down to ground floor
stairs down to ground floor
painting exterior trim on a hot day
painting exterior trim on a hot day