Mister Max |
profile
|
all galleries
>>
The Cynwyd Train Station and the Cynwyd Trail are on Track
>>
Cynwyd Train Station Revitalization
>> Construction at the Cynwyd Station, June 25-29, 2012
tree view
| thumbnails |
slideshow
Construction at the Cynwyd Station, June 25-29, 2012
Photos by Max Buten and Ted Goldsborough
new concrete in 3 places
concrete on both sides
raised concrete platform on the station side
concrete steps & platform
label for Detectible Warning Surface
raised platform-opposite side
The ditch is for footing for the platform, not a drain
The blue insulation at the ramp wall has since been buried
a crack in the ramp wall
Two drains empty into the gully on the station side
drains have been added on the track side of the station - right side
drains have been added on the track side of the station - left side
View from the station - looking left.jpg
View from the station - looking right.jpg
comment
|
share
Type your message and click Add Comment
It is best to
login
or
register
first but you may post as a guest.
Enter an optional name and contact email address.
Name
Name
Email
help
private comment
click on thumbnails for full image