photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> July 2009 - Cynwyd Train Station tree view | thumbnails | slideshow

July 2009 - Cynwyd Train Station

Revitalization continues, with work on the posts supporting the Canopy and on the exterior windows and doors.

There are many more photos of the Station work and of the Cynwyd Heritage Trail at Sarah's flicker site
previous pagepages 1 2 ALL next page
The new post is a lamination of 5 heavy mahogany boards.
The new post is a lamination of 5 heavy mahogany boards.
Elsewhere in the building, other exterior work continues.
Elsewhere in the building, other exterior work continues.
And work continues on the exterior - here, nailing a corner
And work continues on the exterior - here, nailing a corner
Two old posts are re-erected with steel bottoms on deep footings
Two old posts are re-erected with steel bottoms on deep footings
One old post and one new complete the posts holding up the Canopy
One old post and one new complete the posts holding up the Canopy
Posts are set on concrete footings and holes are filled
Posts are set on concrete footings and holes are filled
The roof of the Canopy is removed.  Some beams are replaced
The roof of the Canopy is removed. Some beams are replaced
Insulated glass on the door
Insulated glass on the door
Upstairs, the canopy is braced . . .
Upstairs, the canopy is braced . . .
. . . and roof joists are replaced
. . . and roof joists are replaced
previous pagepages 1 2 ALL next page