 Outside sign on the front door |
 drains near the bridge_8345 |
 Outside view of the waiting room from the driveway side_8343 |
 Outside view of the waiting room from the track side_8344 |
 First floor, with very little floor_8333 |
 Charcoaled beams on the first floor ceiling_8293.JPG |
 bricked up window_8301 |
 closed window F_8305 |
 Entrance door from the driveway. It's now locked with warning sign: "Caution no Floor" |
 first floor, from basement_8310 |
 storage room, formerly a lavatory |
 view from the first floor_8330 |
 laser level for the first floor_8300 |
 Temporary main entrance to the basement _8283 |
 Original Concrete Stairs_8278 |
 Rusty plate under doorway_8290 |
 existing gas meter_8316 |
 termite damage_8320 |
 Brick wall over wood beam over stone foundation_8308 |
 Ceramic Insulator_8280 |
 Graded rocks to reuse_8294 |
 Crawlspace under the original waiting room, on the bridge side |
 Re-supported beams with old wire and insulators_8279 |
 first floor and basement walls with juncture repaired |
 temporary support and brick above stone_8295 |
 temporary supports_8304 |
 building a temporary cement block support for the drainpipe |
 temporary stairway to first floor_8309 |
 Basement room under the present waiting room |
 The foundation on the left has been repaired_8318 |
 This corner of the foundation is finished |
 construction conference |
 construction wires and ladder_8306 |
 Jerry and Matt take a photo_8331.JPG |